This is the part of an aircraft’s Maintenance Manual that is FAA approved.
How many current light helicopters are in the fleet?
21
What is Form 0100-B and who does it need to go to after it’s complete?
In the field parts receiving form to be filled out for drop shipments only and then sent to Trever Davis in shipping/receiving.
What is placed on an empty or low stock hardware consumable box in the H2 Consumable section?
Red Arrow
All Parts shipments received in the field by a mechanic shall be inspected and have a ______________ Completed before the part may be installed on the aircraft
Parts Receiving Preliminary Inspection form 0100-B
This part of the Code of Federal Regulations governs rotorcraft external load operations.
What is Part 133?
How many of the current 21 light aircraft are 407s?
17
How many field are required to be filled out on the new style yellow tags?
All 13
After you use a part from your CSK you should make sure you do what before putting the CSK back?
Submit a I/R to replace the part you used
How many inspector signatures are required to install and sign off a starter install on an aircraft in the field according to our repair station.
Zero, any Certified A&P on the roster may perform a maintenance function, with either another mechanic for pilot signature. (maintenance inspection must be QA)
Agriculture, forest and wildlife conservation, aerial surveying, patrolling, weather control and aerial advertising are all examples of this for restricted category aircraft.
What are special purpose operations?
How many of the 24 light aircraft in 2017 were 407s?
7
What is the two most important fields to verify before allocating your part in the field?
S/N/LOT# & Location
What information should go in the “description” box on a I/R?
The reason as to why you need the part
How does PJ Operations know when a downed aircraft has been Returned back to Service and the team has been cleared to go back to work.
The RTS statement is signed and sent to dispatch for notification
Part 135 aircraft must be weighed at this interval.
What is 36 months?
Last 4 years of average light helicopter flight hours?
6500
What two field validate a Serviceable Tag?
Both the Technician & Inspector Signature & Stamp
If you want to order a consumable we have NEVER had who should you talk to first?
Your PM
How many trailers will the PJ Maintenance team have for chase trailers in 2025.
25 total, 16-32’ goosenecks, 5- 24’ pull behinds, 2-16’ pull behinds for light fleet, 1-20 foot wood trailer that is a catchall, and 1 structures chase trailer
This class of load combination is where an external load is jettisonable and is lifted free of land or water during the rotorcraft operation.
What is Class B?
How many 150 inspections on average per year?
43
What does PJH-T indicate?
Internal PJH P/N for a Tool
Explain how to find the ETA of the part you ordered?
Type P/N in Item Catalog, Select the P/N, Select the Purple Box “On Order”, Select the P/O, & Verify the ETA Date
When working for a quanta construction job, when are you required to where a hard hat.
Any time you are out side on the working jobsites.