Airworthiness
Light Aircraft
Spares Department 1
Spares Department 2
Field Maintenance
100

This is the part of an aircraft’s Maintenance Manual that is FAA approved.


    • What is the Airworthiness Limitations Section (ALS)?
100

How many current light helicopters are in the fleet?

21

100

What is Form 0100-B and who does it need to go to after it’s complete?

In the field parts receiving form to be filled out for drop shipments only and then sent to Trever Davis in shipping/receiving.

100

What is placed on an empty or low stock hardware consumable box in the H2 Consumable section?

Red Arrow

100

All Parts shipments received in the field by a mechanic shall be inspected and have a ______________ Completed before the part may be installed on the aircraft

Parts Receiving Preliminary Inspection form 0100-B

200

This part of the Code of Federal Regulations governs rotorcraft external load operations.

What is Part 133?

200

How many of the current 21 light aircraft are 407s?

17

200

How many field are required to be filled out on the new style yellow tags?

All 13

200

After you use a part from your CSK you should make sure you do what before putting the CSK back?

Submit a I/R to replace the part you used

200

How many inspector signatures are required to install and sign off a starter install on an aircraft in the field according to our repair station.

Zero, any Certified A&P on the roster may perform a maintenance function, with either another mechanic for pilot signature. (maintenance inspection must be QA)

300

Agriculture, forest and wildlife conservation, aerial surveying, patrolling, weather control and aerial advertising are all examples of this for restricted category aircraft.

What are special purpose operations?

300

How many of the 24 light aircraft in 2017 were 407s?

7

300

What is the two most important fields to verify before allocating your part in the field?

S/N/LOT# & Location

300

What information should go in the “description” box on a I/R?

The reason as to why you need the part

300

How does PJ Operations know when a downed aircraft has been Returned back to Service and the team has been cleared to go back to work.

The RTS statement is signed and sent to dispatch for notification

400

Part 135 aircraft must be weighed at this interval.

What is 36 months?

400

Last 4 years of average light helicopter flight hours?

6500

400

What two field validate a Serviceable Tag?

Both the Technician & Inspector Signature & Stamp

400

If you want to order a consumable we have NEVER had who should you talk to first?

Your PM

400

How many trailers will the PJ Maintenance team have for chase trailers in 2025.

25 total, 16-32’ goosenecks, 5- 24’ pull behinds, 2-16’ pull behinds for light fleet, 1-20 foot wood trailer that is a catchall, and 1 structures chase trailer

500

This class of load combination is where an external load is jettisonable and is lifted free of land or water during the rotorcraft operation.

What is Class B?

500

How many 150 inspections on average per year?

43

500

What does PJH-T indicate?

Internal PJH P/N for a Tool

500

Explain how to find the ETA of the part you ordered?

Type P/N in Item Catalog, Select the P/N, Select the Purple Box “On Order”, Select the P/O, & Verify the ETA Date

500

When working for a quanta construction job, when are you required to where a hard hat.

Any time you are out side on the working jobsites.