Ch. 13
Ch. 14
Ch. 15
Ch. 16
Ch. 13,14,15,16
100

Final pressure test of a medical gas system is for a ____ duration?

24 hour

100

Where sleeves are installed for a fire-resistance-rated assembly, they___      

Should be securely fastened to the rated assembly

100

All valves, including the three-way valve, shall be ___

Accessible

100

Rainwater catchment systems intended to supply uses such as dishwashers shall be

Prohibited

100

In chapter 15 what section does it talk about Surge Tanks.

1502.9.1

200

Copper to copper joints shall be ____+

Brazed

200

_____piping shall not connect to noncombustible piping unless it can be demonstrated that the transition is in accordance with this chapter

Combustible

200

The distance between a septic tank and a gray water disposal field shall be ?

5 Feet

200

Rainwater catchment tanks shall be marked ___

NONPOTABLE RAINWATER

200

Ch. 13 what section?

Piping shall be protected against freezing, corrosion, and physical damage.

1310.3

300

The initial test of medical gas piping requires a minimum test pressure of _____ psi.

150 psi

300

Who shall determine the type, size, and quantity of penetrations to be inspected?

AHJ

300

All valves shall be equipped with locking feature except for ?

fixture supply control valves

300

Rainwater shall be collected from ____

roof surfaces

300

What chapter talks about Alternate Water Sources For Nonpotable Applications?

Chapter 15

400

In Ch. 13 where does it talk about Emergency Shutoff Valves?

1312.1.3

400

What section talks about insulation and coverings?

1404.5

400

What section does it talk about Maintenance Responsibility?

1501.5.3

400

Where does it say primary and secondary roof drains, conductors, leaders, and gutters shall be designed and installed in accordance with this code.

1602.9.7

400

What section in Ch 16.?

System components shall be properly identified as to the manufacturer.

1601.4 Component Identification

500

What section?

Zone valves shall be readily operable from a standing position in the corridor on the same floor they serve.

1312.6.1

500

What section?

Construction documents shall indicate with sufficient detail how penetrations of fire-resistance-rated assemblies shall be firestopped prior to obtaining design approval

1402.1

500

What section?

A backwater valve shall be installed on gray water drain connections to the sanitary drain or sewer.

1502.9.7

500

What section?

Tanks and piping installed in locations subject to freezing shall be provided with an approved means of freeze protection.

1602.9.9

500

What chapter and section?

In the event that a cross-connection is discovered, the following procedure, in the presence of the AHJ, shall be activated immediately.

Chapter 16 1602.11.2.3 Discovery of Cross-Connection