100

LIFEBELT OF THE MONTH

safety operated all vehicles(DRIVE SAFETY)

100

What is the focus of PSMS?

 To eliminate Life Altering Injury

100

Failure to keep the hole full of mud while tripping can cause this.

a kick

100

What is the kick off point?

is where the well deviates from vertical

100

what size is our flow line?

12 inch

200

What is C.O.A.C.H

care, observe, approach, converse, help

200

HOW MANY LSRA'S MAKE UP PSMS? MENTION 5

12 

breaking containment

bypassing safety controls

confined space entry

driving

energy isolation 

excavation

hot work

line of fire

safe mechanical lifting

working around mobile equipment

work authorization

working at height


200

Which gas do you use to pre-charge the accumulator bottles on a BOP hydraulic control unit?

Nitrogen

200

What is EDS on an oil rig?

emergency disconnect system/sequence

200

how may tong cylinders does xgrip have?

12

300

what are the H&P core values?

actively care

service attitude

innovative spirit

teamwork

do the right thing


300

WHAT IS LMRA

WHAT ARE THE 3 STEPS

LAST MINUTE RISK ASSESSMENT

stop

think

act


300
what are some of the barriers during drilling?





First drilling fluid column and secondary barrier elements are casing, casing cement, wellhead, BOP

300

What is the name of the component that protects the system from Overpressuring?

pressure relief valve

300

What is the TDS Hydraulic fluid Reservoir Capacity?

25 gals

400

what are the four e-permits available electronically on esafe?

lo/to/to

hot work

confined space entry

overhead tool checklist

400

IN THE SAFETY IN THE MOMENT FLOW CHART WHEN DO WE STOP WORK AND DISCUSS

WHEN WE ENCOUNTER HOLD POINT OR TRIGGER

400

what is the total gallons required to close the BOP? and how many bottles do we  

41.58 gallons

23.58gls annular

5.8gls rams

0.6gls HCR

400

What is the Christmas tree on an oil well?

a piece of equipment that provides flow control on a oil or gas well. Christmas trees are a vertical assembly of valves with gauges and chokes that allow for adjustments in flow control as well as injections to stimulate production

400

What is the shaker system?

This is the primary method of removing solids from the mud

500

In a lockout/tagout procedure, who are the affected employees

those who operate or use the machine or equipment being serviced, or whose work requires them to be in the area where the service or maintenance is being performed

500

WHAT IS THE RULE FOR LSRA WORKING AT HEIGHT

PROTECT YOURSELF AGAINST A FALL WHEN WORKING AT HEIGHT 

500

Explain Well Shut-in Procedure While Drilling (Hard Shut-in)

a. Stop Drilling and Space out DP

b. Stop pumping & Rotation

c. Confirm well flowing

d. If flow is detected, initiate shut-in procedure

e. Sound the kick alarm

f. Open the Choke line valve (HCR Valve)

g. Close the Upper Pipe Rams or Annular Preventer

h. Verify Choke is closed

i. Record SIDPP & SICP at a specified interval

j. Record Pit gain

500

Which US governmental agency is responsible for worker safety in the oil and gas industry?

OSHA (Occupational Safety and Health Administration)

500

HOW MANY AND WHAT SIZE ARE THE CENTRIFUGAL PUMPS ON THE RIG?.

4 FOUR

 1 IN X 1.5 IN X 8.5 IN

 3 IN SUCTION x 2 IN DISCHARGE x 13 IN

 4 IN SUCTION x 3 IN DISCHARGE x 13 IN

  8 IN SUCTION x 6 IN DISCHARGE x 14 IN