100

THIS SIGN MIGHT BE 'EDGY"

NO EDGE LINES

100

THIS 'CLASS' OF MARKINGS IS FOR SHORT TERM USE

CLASS II

100

WORK ZONE MARKING SIGN

EACH

100

USED TO DOCUMENT THE WORK ZONE

GO FORMZ 614 MAINTAINING TRAFFIC INSPECTIONS QUALITY CHECKLIST

DAILY WORK REPORT

100

EQUIPMENT SHOULD BE STORED THIS FAR BEHIND GUARDRAIL

6 FEET

NOTE - CABLE BARRIER IS EXCLUDED AS A MEANS OF PROTECTING DRIVERS FROM STORED ITEMS

200

THIS SIGN WILL NOT "PASS"

DO NOT PASS

200

MARKINGS NOT IN USE OR ONES THAT CAUSE CONFUSION TO THE DRIVER

CONFLICTING MARKINGS

200

DETOUR SIGNING

DETOUR SIGNING LUMP SUM ITEM

200

FULL ROAD CLOSURE WITH DETOUR

INSPECTION PRIORITY -2

DOCUMENT PRIORITY-2

FREQUENCY MODIFIED TO ONCE WEEKLY BY PROJECT STAFF

200

RESPONSIBLE PARTY FOR FILLING POTHOLES IN AN ACTIVE WORK ZONE

CONTRACTOR

300

THIS SIGN "CARES"

PASS WITH CARE

300

THIS 'CLASS' OF MARKINGS IS USED WHEN PERMANENT THERMOPLASTIC MARKINGS ARE TO BE APPLIED

CLASS III

300

GROOVED PAVEMENT SIGN

INCLUDED IN LUMP SUM MOT

300

LONG TERM WORKZONE (72 HRS. +) WITH PORTABLE BARRIER AND/OR DRUMS

INSPECTION PRIORITY -2

DOCUMENT PRIORITY-2

FREQUENCY MODIFIED TO TWICE WEEKLY BY PROJECT STAFF

300

THIS DEVICE CAN BE USED IN LIEU OF FLAGGERS

AFADs (AUTOMATED FLAGGER ASSITANCE DEVICES) SS 830 & ENGINEER APPROVAL

400

THIS SIGN IS NOT PAID AS A WZ MARKING SIGN

GROOVED PAVEMENT

400

TIMEFRAME WHEN CLASS II MARKINGS NEED TO BE REPLACED

14 CALENDAR DAYS

400

TRUCK MOUNTED OR TRAILER MOUNTED ATTENUATOR

INCLUDED IN LUMP SUM MOT

400

NEW WORK ZONE SETUPS

INSPECTION PRIORITY -2

DOCUMENT PRIORITY-2

FREQUENCY MODIFIED TO WITHIN 24 HRS (ASAP) BY PROJECT STAFF

400

THIS TYPE OF LIGHT IS ON A ROAD CLOSED TYPE III BARRICADE

TYPE B (BLINKS 24/7)

500

SIGNS TO BE PLACED AT LEAST ONCE EVERY _ MILES

2 MILES

500

TIMEFRAME WHEN 'NO-PASSING' ZONES NEED TO BE RE-ESTABLISHED BY CLASS I MARKINGS

3 CALENDAR DAYS

500

DSL ASSEMBLY

SIGN MONTH - 30 DAY PERIOD THAT STARTS ON INITAL DAY OF ACTIVATION (SS 808.06)

500

TIMEFRAME FOR INSPECTIONS DURING THE "OPPOSITE WORK CYCLE"

MONTHLY

IF PROJECT IS NORMALLY INSPECTED DURING THE DAYLIGHT HOURS WOULD ALSO BE INSPECTED ONCE A MONTH DURING NON-DAYLIGHT HOURS

500

THIS IS REQUIRED WHEN WORKING ON A MULTI-LANE HWY (45mph +) IN A CLOSED LANE/SHOULDER WITHOUT A TRAFFIC BARRIER

TRUCK-MOUNTED OR TRAILER ATTENUATOR (TMA) 614.03D