On Call Expectations and Requirements
Trash Out and Inventory
Managing Work Orders and Resident Expectations
Vendor Management
Punch/ Final Walk
&
R&M Supplies
100

During an after-hours emergency, you have this long to arrive on-site to report to the concern.

What is 1 hour?

100

This process involves removing all remaining items and debris from a unit after a resident moves out.

What is a trash out?

100

This system is used by maintenance teams to manage work order entry, updates, and completion

What is the Entrata Facilities App?

100

All vendors must check in with the General Manager and Facilities Manager for assignments and updates, and should not communicate directly with these teams.

“What is office or maintenance staff?

100

This maintenance process ensures all appliances, fixtures, and touch-up paint have been addressed

What is Punch?

200

During an emergency call, maintenance should focus on this immediate action before any permanent fixes are made

What is assess concern and follow up with General Manager

200

During a trash out, all personal belongings left behind by the resident should be handled in this way.

What is inventoried by a Manager?

200

This ongoing responsibility ensures the community still looks and functions properly during turn.

What is maintaining grounds, curb appeal, and amenity spaces?

200

Vendors should never have unsupervised access to these areas.

What are the maintenance shop, storage units, and storage apartments?

200

This is the final step before an apartment is approved as move-in ready.

What is Final Walk or Sparkle?

300

These two items must be completed for every after-hours emergency or on-call.

What is a work order and an emergency on-call form?

300

This must be completed to accurately record the condition of the unit and any items left behind after move-out.

What is a move out Inspection?

300

Turn season does not change this required completion timeframe for active work orders.

What is 96 hours?

300

These vendors require materials supplied by the property, which must be tracked using a sign-out and sign-in process

What are painters and painting supplies?

300

These non-capital items are typically stocked in bulk to support routine maintenance needs

What are items such as blinds, outlet covers, light bulbs, batteries, sink aerators, and door stops?


400

When setting up emergency on-call rotations during Managers should consider these factors

What is technician work load?

What is the time Frame?

What projects are happening on-site?

400

When items are found in a vacant apartment, this process is used to secure and label them for proper handling

What is a ‘bag and tag’?

400

Even during turn season, we are still expected to serve our current residents by doing this.

What is monitoring and completing resident service requests

400

These must be signed out each morning and returned daily by all on-site vendors.

What are master keys?

400

These are considered capital items because they involve major replacements or upgrades rather than routine maintenance.

What are HVAC systems, water heaters, and major appliances (Full Replacements)?

500

A resident calls after hours for a leaking bathroom sink only when the sink is running, responding this way demonstrates correct emergency maintenance judgment.

What is not treating it as an emergency and scheduling repairs during office hours?

500

Although items valued at $100 or less are not typically inventoried, we still make an effort to identify and document these types of items when found

What are personal or sentimental items such as clothing, photos, and textbooks?

500

On move-in day, there is often a surge of service requests submitted by residents- this is the correct way to manage expectations while maintaining service standards.

What is set realistic expectations with residents and triage service requests based on priority?

500

To ensure proper communication and accountability during turn, vendors must have this role present on-site.

What is a team lead or supervisor?

500

installing new oven/ stove in a unit versus replacing a burner, board, or drip pan- these fall into these two categories.

What are capital expenses and  regular Repair and Maintenance (R&M)?