Autoflow
OSP
Trans Management
SEVs / Mechanical Downtime
Misc
100

The HCs in AF that are planned and should be followed/staffed to

What is 'Required'

100

OSP plans across this planning horizon

20 hours

100

The number of units missed in a single trans CPT that will require a bridge

What Is 5k?

100

2 sorters that can lead to high scanned if they are jamming or hard down

Flats Sorter

Shipping Sorter

100

This is a system that prioritizes pre-picked BL based on Cost, Capacity and Transportation

Euler

200

This is how long you have to promote an accepted plan into AF before "expiring"

30min

200

The Rate % prediction in OSP for NHs and Cross-trains

NHs:

50%/60%/70%

Cross-Trains

70%/80%/90%

200

Missing Trans in this workpool will require an ADHOC in most cases

What is "Palletized"

200

What we should be monitoring if 1 or more pick floors are down

What is ' incompletes '
200

What happens when you disable an AFE in AF

What is 'CCC will push BL to the active AFE'

300

The process in which AF pulls its predicted rates

What is ...

Pulls last 2 hours of data and takes the average of the 2. If they are far off, AF will take the last hour rate since it is the closest

300

In OSP you can view risk in these 3 categories, per path, based on your update planning

•Pick Capacity Risk

•Pack Capacity Risk

•Scheduling Risk


300

The % of risk you will have if you have 108k units due out in 6.25 hours while processing at 5.2k/hour

What is 55%

300

You are currently processing at 30k for CE and 8k in Trans. Your trans line goes down and the site says they can now only process 3k/hour in trans. What is your new pick ask and Pick HC assuming a 314 pick rate

33k ask /105 HC

300

The escalations for Scanned thresholds and actions

What is 

5k - TL

8k - TL/AM

10k - TL/AM/Ops

12k - Throttle

400

This will show on AF with a lighting bolt and small note at the bottom. It does not calculate chasing TUR into total TUR.

What is "Chase Mode"

400

This value is showed in OSP but is not actually used as an input for planning

ALPS (21DP)

400

All the MIN Filters in Trans and what they do

1 - Super Savers

4 - Normal/Std

10 - Premium

15 - Fast Track

16 - Same/Next


Filters that we can apply to trans to target reactive units at risk
400

If SP goes down and ETA reaches this time, we will request what kind of TT from the site and what will this do?

Request a CCC TT from the site so ARC can action on and move BL to SS depending on risk evaluations

400

This W/I reason code can only be used in the last hour of shift

What is "Attrition"

500

Autoflow can only pick a transshipment path if at least one of the following holds:

•The ExSD has more than 1500 units in its backlog for AR sites or 1400 units in its backlog for most Legacy/Batchy sites and the path is not currently open.

•The ExSD has more than 250 units in its backlog and the path is open.

•The time is within 3 hours of the ExSD.

500

This is how OSP calculated the predicted HC

Mytime Roster * Attendance % based on 4 weeks of data

500

The criteria for MIN10s/MIN15s

MIN-10 Criteria

•If D/C WITHOUT Charge for a CPT on current shift or next shift is (within 10 hours) >100% AND FT D/C WITHOUT Charge for the same CPT is >75%

  Then Recommend Labor Moves AND Apply MIN10

MIN-15 Criteria

•If D/C WITHOUT Charge for a CPT on current shift or next shift is (within 10 hours) >100% AND FT D/C WITHOUT Charge for the same CPT is >90%

  Then Recommend Labor Moves to Process Path AND Apply MIN15

500

Two options you can recommend if the Flats Sorter goes hard down

•Pause SingleSmalls and SmartPac processing until conveyance is operational.


•Pause all packing operations and pick transship only.

500

CORA pulls capacities from this web tool to determine risk

Lagrange