One
Two
Three
Four
100

A management process for determining and acquiring the range and quantity of support items necessary to operate and maintain an end item of material for an initial period of service 

What is provisioning?

100

First time Provisioning of a new item

What is initial provisioning?

100

Subsequent provisioning of the same end item from the same contractor 

What is follow-on provisioning?

100

Subsequent provisioning of the same end item from a different contractor

What is reprovisioning?

200

A list of parts that are required to maintain and support a piece of equipment

What is a Provisioning Parts List (PPL)?

200

Our Enterprise Resource Planning (ERP) system that is based on the industry standard Systems, Applications, and Products (SAP) architecture

What is the Logistics Modernization Program (LMP)?

200

Item that is already out there in the market and does not require development

What is a Non-developmental Item (NDI)?

200

Item that needs to be designed and developed through engineering 

What is a Developmental Item (DI)?

300

Who do provisioners support 

Who is the Warfighter?

300

Engineering data used in the initial provisioning of support resources

What is Engineering Data for Provisioning (EDFP)?

300

Meeting that identifies the data requirements and any additional hardware that needs to be included in the contract and is the first step for provisioners to gather information.

What is a Data Call?

300

What the acronym NSN stands for

What is National Stock Number?

400

Publication that lists and authorizes the parts, tools, and equipment needed to maintain a weapon system or equipment

What is the Repair Parts & Special Tools List (RPSTL)?

400

Modified equipment to meet current Army requirements

What is Design Change Notice (DCN)?

400

This system structure shows the relationship between the PLISNs and their NHA PLISNs?

What is the Family Tree?

400

This provides a basic guide of the Provisioning Process

What is the Milestone Chart?

500

Five Contract Deliverable Requirements Lists (CDRL) that provisioners are responsible for developing?

What are Parts Provisioning List (PPL), Repair Parts and Special Tools List (RPSTL), Engineering Data for Provisioning (EDFP), Design Change Notice (DCN), and Pre-Screening?

500

These are parts/steps of this lifecycle

What is the Army Provisioning Process?

500

The report is used in the selection procedures to identify repair parts requirements in support of the equipment to be fielded

What is the LSA-036?

500

This Army Regulation is for Provisioning of US Army Equipment?

What is AR 700-18?