SHORTCUTS
DOMAIN 1 CONCEPTS
DOMAIN 1 VOCABULARY
COPYRIGHT
PROJECT MANAGEMENT
100

CTRL + O

OPEN

100

TRUE OR FALSE

The first step in any design process is to identify the target audience.


TRUE

100

mockup

a prototype or design of the layout.

100

Copyright

A category of intellectual property providing protection to the authors of “original works of authorship,” including literary, dramatic, musical, artistic, and certain other intellectual works. This protection is available to both published and unpublished works.

100

Executing a successful project is in the______________

planning

200

ZOOM TOOL

Z

200

A publicized work is a work that is based on or derived from one or more  existing works (and previously published).

A derivative work is a work that is based on or derived from one or more  existing works (and previously published).

200

project scope

how long it should take

200

When does a work become copyrighted?

Copyright attaches to a work as soon as it is created.

200

stage 1 of project planning includes these things: Must name at least 3

Identify the elements of the project. This includes defining the goals, target audience, content and style, and delivery requirements. If you are working with a client, you want to formulate questions for the client to answer to aide you at this time. This stage is the most crucial because everything is defined in this stage. Create a list of items the projects needs in order to meet the criteria that has been defined. The items identified in this stage are called deliverables.

300

MOVE TOOL

V

300

The second stage of project planning requires you to develop the deliverables. 

true or false

false

300

fair use doctrine

allows copyrighted work to be reproduced for a variety of reasons including news reporting, teaching, parody, and research.

300

define: publication

The 1976 Copyright Act defines publication as the

distribution of copies of a work to the public by sale or other transfer of ownership, or by rental, lease, or lending. The use of the notice is the responsibility of the copyright owner and does not require permission from, or registration with, the Copyright Office.

300

stage 2 of project planning includes these things: Must name at least 3

2—Scheduling: You need to create a schedule with due dates based on the deliverables identified in the previous step. If you are working on a team, the leader also needs to assign tasks to members of the team. Also important at this stage is to identify a plan for communication. It is a good idea to create a document that identifies who needs to be kept informed and how often. This document usually details the status of the project, tasks and next steps, any decisions that need to be made, and an update on the schedule.

400

SELECT INVERSE

CTRL + SHIFT + I

400

another term for sketch is a ________________,  which shows the layout either on paper or in graphics editing application to show the client. 

Design comp

400

Scope creep

changes in the requirements of the project as the project is being constructed.

400

how do writings, artwork, video, graphic design need to be marked in order to be considered copywrited?

The notice for visually perceptible copies should contain the following three items which should appear together or in close proximity on the copies:

■ The symbol © (letter C in a circle); the word Copyright; or the abbreviation Copr.

■ The year of first publication. If the work is a derivative work or a compilation incorporating previously published material, the year of first publication of the derivative work or compilation is sufficient.

■ The name of the copyright owner, an abbreviation by which the name can be recognized, or a generally known alternative designation of owner (e.g., © 2013 Jane Doe).

400

stage 3 of project planning includes these things:

Must include at least 3

Stage 3—Building: You need to develop a sketch of the layout either on paper or in a graphics-editing application to show to the client. The sketch, or design comp, should meet the initial needs that were identified in stage 1 and be approved by the client before moving forward. You may need to rework the design comp and show it to the client more than once. You may also want to include a storyboard if your design involves navigation elements. The storyboard helps explain the navigational flow. 

500

MAGIC WAND TOOL

SHIFT + W

500

Name the 5 stages of successful project planning.

1. planning and analysis

2. scheduling 

3. building

4. review and evaluation

5. implementing or publishing

500

target audience.

■ Internal audience in a company

■ Age

■ Geographical location or region of the country

■ Gender

■ Ethnicity

500

What Four factors need to be considered together when determining if the use is fair, and fair use is only determined by the courts. (fair use doctrine)

■ The purpose and character of the use, including whether such use is of a commercial nature or is for nonprofit educational purposes

■ The nature of the copyrighted work: Is the original primarily factual or fiction published or unpublished?

■ The amount and substantiality of the portion used in relation to the copyrighted work as a whole

■ The effect of the use upon the potential market for, or value of, the copyrighted work

500

stages 4 and 5 of project planning includes these things:

Must include at least 2 from each

Stage 4—Review and evaluation: The project needs to be reviewed for accuracy to ensure the design meets the requirements set forth in the project outline. Allow for extra time during this stage; problems may arise during the review process, or the client may want to make changes.

■ Stage 5—Implementing or publishing: Once the final product meets the client’s satisfaction, it is time to publish the final project to the medium for which it was designed.