Structural Engineering
Construction
Architecture
MEP Engineering
CIRT Competition
Random
100

Which of the following is NOT a typical building material: Bamboo, Concrete, Steel, Plywood

Bamboo

100

True or False - once construction starts, the design never changes

False

100

What is NOT a style of architecture: mythic, gothic, brutalist, Victorian

mythic

100

What is NOT a sustainable source of power: solar, coal, geothermal, wind

coal

100

Which team used AI to create images: site design, stadium design, engineering, construction

stadium design team

100

Who won ACE mentor of the year this year?

Yao

200

True or False - California requires seismic bracing in buildings

True

200

Which is NOT included in a typical construction deliverable: schedule, estimate, promise to finish the project on time, logistics plan

promise to finish the project on time

200

Which of the following shows a birds eye view of the project: plan, section, parametric, axonometric

plan

200

What do the letters MEP stand for?

mechanical, electrical, plumbing

200

Which team made collages out of paper: site design, stadium design, engineering, construction

site design team

200

What does ACE stand for?

Architecture, Construction, Engineering

300

Which of the following is NOT a force that engineers deal with: Tension, Compression, Shear, Meshing

Meshing

300

What was NOT a rule of our gingerbread activity: must maintain a quiet construction site, must match photo on the box, no eating frosting

must maintain a quiet construction site

300

What drawing did we make when we drew our shoes vertically cut in half: plan, section, parametric, axonometric

section

300

What MEP category would pipes in a bathroom fall under?

plumbing

300

Which team evaluated the cost of the facade: site design, stadium design, engineering, construction

construction team

300

What should NOT go on your resume: email, phone number, graduation date, home address

home address

400

Which of the following is NOT considered a live load: Furniture, Cars, Concrete, People

Concrete

400

True or False - the only math needed to estimate is multiply/divide & add/subtract

True

400

What is the FIRST phase of design: programming, design development, construction documents, schematic

programming

400

What MEP category would air conditioning fall under?

mechanical

400

Which team researched natural disaster risks at our site: site design, stadium design, engineering, construction

engineering team

400

What Olympic event could NOT be hosted at our stadium: soccer, basketball, indoor volleyball, water polo

water polo

500

The bridge in our CIRT project was supported by what?

Trusses

500

Which of these items are NOT PPE needed on a construction site: hardhat, tool belt, high visibility vest, boots

tool belt

500

What is NOT a type of drawing we talked about: plan, section, parametric, axonometric

parametric

500

What MEP category would wiring for lights fall under?

electrical

500

What year is Paris hosting the Olympics?

2024

500

 In what year was ACE Mentor LA/OC chapter founded?

2002