This part of the project team is responsible for providing all of the material, labor, equipment and services needed for the construction of the project.
Who is the GENERAL CONTRACTOR
100
This division is #12
What is FURNISHINGS
100
This drawing phase shows about 30-40% completion preliminary drawings
What is SCHEMATICS
100
This division is #15
What is MECHANICAL
100
This division is #9
What is FINISHES
200
The MEP engineers typically work for the...
Who is the ARCHITECT
200
This division is #16
What is ELECTRICAL
200
This project phase occurs after the construction & furniture is installed
What is POST-OCCUPANCY EVALUATION
200
This division is #4
What is MASONRY
200
This division is #10
What is SPECIALTIES
300
An owner hires this consultant first when starting a new project
Who is the ARCHITECT
300
This CSI division includes Terrazzo
What is FINISHES
300
This drawing phase includes the GMP (gross maximum price)
What is DESIGN DEVELOPMENT
300
This division includes Transportation
What is CONVEYING SYSTEMS
300
This division is #2
What is SITE CONSTRUCTION
400
An architect is responsible for hiring & paying these consultants on a project
Who are ENGINEERS
400
This division includes Manufactured Casework
What is FURNISHINGS
400
This drawing phase is the initial phase of the project & includes sketch-type drawings
What is PROGRAMMING
400
This division includes Flashing and Sheet Metal
What is THERMAL AND MOISTURE PROTECTION
400
This division is #3
What is CONCRETE
500
This part of the project team "typically" selects the contractor
Who is the OWNER
500
This CSI division includes "access flooring"
What is SPECIALTIES
500
This drawing phase is the final 100% set of drawings
What is CONSTRUCTION DOCUMENTS
500
This CSI division is #14
What is CONVEYING SYSTEMS
500
This division includes Athletic, Recreational, and Therapeutic....