Acronyms + Abbreviations
Spills and Flaring
LOTOs
General Safety
AltaGas
100

EEEP and JEEP 

What is the Edmonton Ethane Extraction Plant and Joffre Ethane Extraction Plant

100

30e3m3

What is the minimum reportable flare volume?

100

This is characterized by separation of the equipment being worked on from other parts of the system. It can be completed through blanking (e.g., physical barrier) or blinding (e.g., disconnection).

What is a positive isolation?

100

The formal process to hazard assess and authorize work within the overall Control of Work Process 

What is a safe work permit?

100

Safety, Collaboration, Integrity, Inclusion and Learning.

What are our Core Values? 

200

HAZOP

What is a hazard and operability study?

200

4 hours

What is the minimum reportable flare duration?

200

Check valves, Blowdown valves, Pressure relief valves (PRVs), Control valves, Pressure vacuum relief valves (PVRVs), Pressure safety valves (PSVs),  Carber plugs

What are valves not to be used in an isolation?

200

Clean shaven, H2S training, Standard first aid training, WHMIS 2015 training and Site orientation

What is required to access site?

200

A leading North American energy infrastructure company that connects customers and markets to affordable and reliable sources of energy.  

What is our Vision Statement?

300

LOPA

What is layers of protection analysis?

300

1 Litre 

What is the minimum reportable spill volume?

300

This person can, using an approved procedure, perform racking of electrical equipment, removal of fuses or wiring disconnect

What is a qualified electrical worker? 

300

CSA Safety Glasses, CSA steel toed boots, NFPA 2112 flame resistant coveralls, High visibility striping, CSA type 1 or 2 class G hard hat

What is the minimum required PPE to enter process area?

300
To improve quality of life by safely and reliably connecting customers to affordable sources of energy for today and tomorrow.

What is our Mission statement? 

400

HPD

What is a hearing protection device?

400

A planned flaring event requires notification to this agency.

What is the AER?

400

Planning, Communication, Preparation, Isolation and De-Energization, Lockout and Verification, Zero Energy Verification, Blind/Blank Installation, Isolation Declaration, Document Control, Pre-Work Validation, Perform the Tasks, De-Isolation

What are the 12 steps of energy isolation workflow?

400

AED is the abbreviation for this device (related to first aid)

What is Automated External Defibrillator

400

AltaGas' 12 Life Saving Rules

What are: Working at heights, Confined Space, Energy Isolation, Safe Mechanical Lifting, Work authorization, Fit for Duty, Driving, Ground Disturbance, Line of fire, Hot Work, Working on Energized Equipment, Bypassing Safety Controls

500

EBITDA 

What is earnings before interest, taxes, depreciation and amortization? 

500

This annual testing program is completed to ensure site contamination is not leeched into the surrounding environment. 

What is the Ground Water Monitoring Program.

500

Isolation characterized by valve isolation with no bleeds available on the system to confirm effectiveness of valve closure before breaking into a system. 

What is a non proven isolation?

500

Elimination, Substitution, engineering controls, admin controls and PPE.

What is the hierachy of controls?

500

Higher and higher. 

What is the projection of AltaGas' stock price?