Milestone 1-3
Milestone 5-6
Milestone 7-13
Product Knowledge
Bonus Round !
Contract Knowledge
100

What are Milestone 1 & 3?

M1: Foundation Layout/Trench

M3: Frame Start 

100

What are Milestones 5 & 6?

M5: Mechanical Rough

M6: Insulation/Drywall 

100

What are Milestones 8 & 9 ?

M8: Mechanical Final 

M9: Flooring/Final Touches 

100

What are the two types of Siding found on an Express home?

Vinyl with LP accents 

100

What are the only excepted forms of EM when closing is 45 days or less?

 cashier and wire only, no personal checks

200

What are the two types of foundation we do?

Crawl and Slab 

200

What is name of the drywall texture on the ceiling?

Skip Trowel 

200

DR Horton offers this type of flooring in high traffic areas

LVP

200

Where would you direct a buyer to find their home specific finishes and options. 

Selected Options Summary 

200

If the BICA is $8,000 what amount goes in line 1a and 1b ?

1a-$6,400 

1b-$1,600

300

These durable materials are used to create a stable foundation for a home?

Rebar and concrete

300

What are the R values of the insulation in the Walls, Floors and Attic ?

Walls: R-21

Floors: R-30

Attic: R-49

300

What are 3 differences between our traditions and express product?

Doors, mini split, fixtures, ceiling height, carpet breaks …

300

What document contains all finishes ?

2A - Construction Specifications

300

Which document is the only sales contract amendment that requires an ink signature signed in actual pen?

Removal of Buyer Amendment

400

This process ensures that storm water is effectively redirected away from the foundation.

grading and drainage

400

DR Horton uses this process to seal opening around windows and doors, improving energy efficiency, and preventing leaks.

Flashing

400

How many inspections does the home have during the entire building process ?

Homes built on Crawls - 8

Homes built on Slabs -10 

400

How thick is the quartz we install?

2cm

400

If a lender does not provide loan updates pursuant to section 6.2.2 of the agreement, what document is sent out to buyers?

Notice of Default Letter

(if an update is not received in 2 additional business days we will seek to terminate)

500

This layer helps prevent moisture from entering the concrete foundation.

Vapor barrier/visqueen

500

Before drywall is installed, these mechanical systems are roughed in to prepare for final fixtures and connections.

Electrical, plumbing and HVAC

500

From breaking ground to final inspection what is our typical days to completion ?

181

500

How many markets across how many states is D.R. Horton in ? 

113 markets across 33 states 

500

If a buyer has a HTS contingency at time of contract, and we write the PSA with an ECOE of 50 days out, how many days do buyers have to obtain financing Loan Approval?

25 days 

(HTS places the loan contingency date in the over 60/HTS category which is 25 days instead of 20 for being under 60)