What are Milestone 1 & 3?
M1: Foundation Layout/Trench
M3: Frame Start
What are Milestones 5 & 6?
M5: Mechanical Rough
M6: Insulation/Drywall
What are Milestones 8 & 9 ?
M8: Mechanical Final
M9: Flooring/Final Touches
What are the two types of Siding found on an Express home?
Vinyl with LP accents
What are the only excepted forms of EM when closing is 45 days or less?
cashier and wire only, no personal checks
What are the two types of foundation we do?
Crawl and Slab
What is name of the drywall texture on the ceiling?
Skip Trowel
DR Horton offers this type of flooring in high traffic areas
LVP
Where would you direct a buyer to find their home specific finishes and options.
Selected Options Summary
If the BICA is $8,000 what amount goes in line 1a and 1b ?
1a-$6,400
1b-$1,600
These durable materials are used to create a stable foundation for a home?
Rebar and concrete
What are the R values of the insulation in the Walls, Floors and Attic ?
Walls: R-21
Floors: R-30
Attic: R-49
What are 3 differences between our traditions and express product?
Doors, mini split, fixtures, ceiling height, carpet breaks …
What document contains all finishes ?
2A - Construction Specifications
Which document is the only sales contract amendment that requires an ink signature signed in actual pen?
Removal of Buyer Amendment
This process ensures that storm water is effectively redirected away from the foundation.
grading and drainage
DR Horton uses this process to seal opening around windows and doors, improving energy efficiency, and preventing leaks.
Flashing
How many inspections does the home have during the entire building process ?
Homes built on Crawls - 8
Homes built on Slabs -10
How thick is the quartz we install?
2cm
If a lender does not provide loan updates pursuant to section 6.2.2 of the agreement, what document is sent out to buyers?
Notice of Default Letter
(if an update is not received in 2 additional business days we will seek to terminate)
This layer helps prevent moisture from entering the concrete foundation.
Vapor barrier/visqueen
Before drywall is installed, these mechanical systems are roughed in to prepare for final fixtures and connections.
Electrical, plumbing and HVAC
From breaking ground to final inspection what is our typical days to completion ?
181
How many markets across how many states is D.R. Horton in ?
113 markets across 33 states
If a buyer has a HTS contingency at time of contract, and we write the PSA with an ECOE of 50 days out, how many days do buyers have to obtain financing Loan Approval?
25 days
(HTS places the loan contingency date in the over 60/HTS category which is 25 days instead of 20 for being under 60)