IT'S ALL ABOUT $$$
THEY WORK FOR US
ARCH. ONLY USES ACRONYMS
HOW COMMON IS COMMON
SOMEBODY THAT YOU USE TO KNOW
100

THE ESTIMATE CAME BACK TOO HIGH, WHICH WARRANTS AN ___________ EFFORT 

VE (VALUE ENGINEERING)

100

OUTSIDE OF STRUCTURAL, THESE FOLKS DRAWINGS ARE MOST COMMON IN ANY TENANT IMPROVEMENT PROJECTS

MEP (MECHANICAL, ELECTRICAL, PLUMBING)

100

IF YOU'RE NOT DRAWING TO SCALE, YOU BETTER SAY WHAT ON YOUR DRAWING

NTS (NOT TO SCALE)

100

THE STATE OF CALIFORNIA ADAPTATION OF THE INTERNATIONAL BUILDING CODE

CBC

100

PROFESSIONAL ORGANIZATION AND ADVOCACY FOR ARCHITECTS IN THE UNITED STATES

AIA (AMERICAN INSTITUTE OF ARCHITECTS)

200

THE PROJECT GETS THE GREEN LIGHT DUE TO THE [ROI] 

RETURN ON INVESTMENT

200

MY LAVATORY NOTES TO PROVIDE [HW/CHW]

HOT WATER AND CHILLED WATER

200

QUESTIONS, QUESTIONS, QUESTIONS. ALL DAY THEY JUST SEND THIS TO ASK ME MORE QUESTIONS.

RFI (REQUEST FOR INFORMATION)

200

CURRENTLY UNDER THE 2010 ADOPTED STANDARDS, THIS ENTITY GOVERNS THE DESIGN OF ANY PUBLIC SPACE TO ENSURE EQUAL ACCESS TO GOODS, SERVICES, AND OPPORTUNITIES.

ADA (AMERICAN WITH DISABILITIES ACT)

200

THIS BUILDING IS A [LEED] BUILDING, BUT WHAT DOES THAT MEAN?

LEADERSHIP IN ENERGY AND ENVIRONMENTAL DESIGN

300

THE FINAL COST OF THE PROJECT'S CONTRACT CANNOT EXCEED A SET COST LIMIT.

GMP (GUARANTEED MAXIMUM PRICE)

300

AVOIDING UNLEVEL SPACE, SOLID BASE, AND VIBRATION ISOLATION, WE TYPICALLY PUT HEAVY EQUIPMENT ON THESE.

HKP (HOUSE KEEPING PAD)

300

IT'S NOT ABOUT HOW MUCH LAND YOU OWN, BUT HOW MUCH SPACE YOU CAN BUILD

FAR (FLOOR AREA RATIO)

300

AUTODESK REVIT IS KNOWN TO DRAW AND MODEL THROUGH THIS METHOD

BIM (BUILDING INFORMATION MODELING)

300

CONSTRUCTION DOCUMENTS MUST ABIDE BY THE BUILDING CODES, BUT THIS ENTITY HAS THE FINAL SAY

AHJ (AUTHORITY HAVING JURISDICTION)

400

THE SPACE ISN'T DONE UNTIL THE [FURNITURE, FIXTURES, AND EQUIPMENT] IS ON SITE AND INSTALLED

FF&E

400

THE BRUTALIST STYLE USES THESE MODULAR UNITS THAT EMPHASIZE THE RAW AND EXPOSED MATERIALS. ALTHOUGH WE TYPICALLY USE THEM FOR RETAINING WALLS OR FOUNDATIONS.

CMU (CONCRETE MASONRY UNIT)


400

THE ARCHITECT'S ISSUED DOCUMENT USE TO COMMUNICATE MINOR CHANGES, CLARIFICATIONS, OR ADDITIONS TO THE ORIGINAL PLANS DURING THE CONSTRUCTION PROCESS.

ASI (ARCHITECT'S SUPPLEMENTAL INSTRUCTION)

400

NOT JUST ANOTHER CARD GAME, BUT SHORTHAND NOTATION THAT APPLIES SPECIFIC DETAIL OR SPECIFICATION IS ASSUMED THROUGHOUT THE PROJECT UNLESS A DIFFERENT DETAIL OR SPECIFICATION IS DESIGNATED

UNO (UNLESS NOTED OTHERWISE)

400

ENTITY PROVIDING OVERSIGHT FOR K-12 SCHOOLS, COMMUNITY COLLEGES, AND VARIOUS OTHER STATE-OWNED AND STATE-LEASED FACILITIES

DSA (DIVISION OF THE STATE ARCHITECTS)

500

ALL WORK IS ON HOLD TILL WE RECEIVE THE OWNER'S DIRECTIVE TO CONTINUE/START.

NTP (NOTICE TO PROCEED)

500

MAIN ELECTRICAL POWER LINE FROM THE CITY COMES INTO A BUILDING AND FIRST RUNS THROUGH THE [MDP] PRIOR TO DISTRIBUTING IT TO OTHERS PARTS OF THE BUILDING.

MAIN DISTRIBUTION PANEL

500

MEASURE TWICE - CUT ONCE. THIS NOTATION ALERTS THE BUILDER THAT DIMENSIONS OR DETAILS NEED TO BE CONFIRMED AGAINST THE ACTUAL CONSTRUCTION SITE CONDITION.

VIF (VERIFY IN FIELD)

500

AT RESTROOMS, LAUNDRY, WITHIN 6'-0" OF SINKS, GARAGES, AND OUTDOORS, YOU WOULD SEE THESE BEING USED.

GFCI (GROUND FAULT CIRCUIT INTERRUPTER)

500

CALIFORNIA FIRE PROGRAM THAT PROTECTS LIFE AND PROPERTY THROUGH REGULATING BUILDINGS, CONTROLLING SUBSTANCES QUANTITY IN SPACES, AND STATEWIDE FIRE PREVENTION.

OSFM (OFFICE OF STATE FIRE MARSHAL)/SFM (STATE FIRE MARSHALL)