Indicates caustic corrosion can be assigned as general or local damage type based on temperature.
What is RS-13
Per this best practice, the Unit level of the hierarchy is intended to be used to create the process or non-process unit/location records in PCMS.
What is BP-29
What color should deadlegs be highlighted on the isometric drawings per P66 useful practices?
What is red.
What shall be entered with the piping for each system into PCMS?
What is Equipment ID
One-stop shop for key contacts, guidance documents, and helpful links.
What is AIMI Guidance SharePoint Page
For piping inspected by partial excavation, buried line lengths less than 50 feet shall be managed per soil to air interface. Due to the questionable effectiveness of cathodic protection within berms and partially buried pipe, LPG lines shall be inspected to a 1 effectiveness.
What is RS-06
Under Accountabilities of BP-27, who is required to be informed in the event of an SAP Notification Creation in the Accountabilities Matrix Process?
What is Planners/Schedulers and Operations Manager
Per P66 useful practices, injection points and mixed points should be identified by what?
What is dashed, red square/rectangle.
When circuitizing P&IDs via CAD, what indicates a circuit break?
What is Single blue line
Program designed for sites to celebrate individuals who are making a real difference in support of the AIMI program.
What is AIMI Way To Go!
According to the P66 Required Standards, depending on the results of the fitness of service assessment, the schedule override(s) could be one-time or reoccurring until a permanent repair is carried out.
What is RS-14
A specific state of an asset’s In-Service stage of life when the asset is not currently in active operation?
What is Idle
What is required to be completed by the vendor, site, and Central Inspection SME's before MS4 submission?
What is MS4/5 Checklist
Provides the AIMI Central Team, Site, and Vendor a guidance document that standardizes the evaluation of meeting readiness prior to the start of each milestone meeting.
What is AIMI Checklist.
If you have to do use multiple inspections for grading to achieve a thinning damage age reset how many years do you go back and what year do you use as the inspection date?
What is 10 yrs & the date of the oldest/first inspection.
Planned/scheduled replacement on a fixed time interval of 10 years, or two turnaround cycles if tied to a processing unit. Or inspection every 5 yrs with replacement at first sign of degradation?
What is HDPE Storage Tanks
Fewer leaks, less operational and safety risks, less LPO, and higher quality, more consistent data analysis are all what according to Phillips 66?
What is Benefits of AIMI
Initial document for each milestone that serves as the starting point to create one set for that will apply to all equipment groups at the site.
What is Global Implementation Assumptions List.
I follow the requirements of M-42-RS-06 and due to nature of different techniques and intervals some portions shall be their own circuit?
What is Buried Piping
The interval for temperature and thinning inspections at Critical Metallurgy Spec Breaks (CSBs) shall not exceed?
What is 5 yrs
For external corrosion, at what max year interval shall over water piping have visual inspections scheduled?
What is 3
Refining documents that provide the guidance on the minimum requirements.
What is Required Standards