Required Standards
Best Practices
Useful Practices
General
AIMI Support
100

What RS indicates caustic corrosion can be assigned as general or local damage type based on temperature.

What is RS-13

100

Per this best practice, the Unit level of the hierarchy is intended to be used to create the process or non-process unit/location records in PCMS.

What is BP-29

100

What color should deadlegs be highlighted on the isometric drawings per P66 useful practices?

What is red

100

Within PCMS, in which field can the identifier of asset or piping system be found?

What is Equipment ID

100

One-stop shop for key contacts, guidance documents, and helpful links.

What is AIMI Guidance SharePoint Page

200

Consequence of failure assessment shall be conducted following API 581

What is M-42-RS-14 / 5.8.1 

200

Under Accountabilities of BP-27, who is required to be informed in the event of an SAP Notification Creation in the Accountabilities Matrix Process?

What is Planners/Schedulers and Operations Manager

200

Per P66 useful practices, how should injection and mixed points be marked on P&IDs?

What is dashed, red square/rectangle

200

When circuitizing P&IDs via CAD, what indicates a circuit break?

What is Single blue line

200

Program designed for sites to celebrate individuals who are making a real difference in support of the AIMI program.

What is AIMI Way To Go!

300

Lists the following questions:

Have all critical deadlegs been reviewed?

Have all established IP/MP's been reviewed?

Have critical DMW's been reviewed?

What is M-42-RS-13 Appendix D 

300

The specific state of an asset’s In-Service stage of life when the asset is not currently in active operation

What is Idle

300

Necessitate the update of RBI and Corrosion assessments

What are changes in process and hardware
300

What is required to be completed by the vendor, site, and Central Inspection SME's before MS4 submission?

What is MS4/5 Checklist

300

Provides the AIMI Central Team, Site, and Vendor a guidance document that standardizes the evaluation of meeting readiness prior to the start of each milestone meeting.

What is the guidance document.

400

The number of years back and inspection date used when multiple inspections for grading are utilized to achieve a thinning damage age reset

What is 10 yrs & the date of the oldest/first inspection.

400

Has a planned/scheduled replacement on a fixed time interval of 10 years, two turnaround cycles if tied to a processing unit, or inspection every 5 years with replacement at first sign of degradation

What is HDPE Storage Tanks

400

Work process required for sites to prepare for, review and update key corrosion and operational information inside the Inspection database?

What is revalidation

400

Fewer leaks, less operational and safety risks, less LPO, higher quality, and more consistent data analysis are all what according to P66?

What is Benefits of AIMI

400

Initial document for each milestone that serves as the starting point to create one set for what will apply to all equipment groups at the site.

What is Global Implementation Assumptions List.

500

Per M-42-RS-06, some portions shall be their own circuit due to the nature of different techniques and intervals

What is Buried Piping

500

Shall not exceed this interval for temperature and thinning inspections at Critical Metallurgy Spec Breaks (CSBs) 

What is 5 years

500

Subdivided into streamlined and complete remodel approaches

What is unit-wide revalidation

500

For external corrosion, at what max year interval shall over water piping have visual inspections scheduled?

What is 3

500

Refining documents that provide the guidance on the minimum requirements.

What are Required Standards