History
Procurement
Risk Registry
Delivery Methods
100

When was Design Build method authorized in Tennessee?

What is May 16, 20007

100

RFQ stands for 

What is Request for Qualification

100

Risks in Design Build refers to:

What is the potential for negative outcomes and loses in the project

100

The delivery method were there's a single entity in design and construction

What is Design-Build

200

When was the first Design Build project at TDOT 

What is 2009

200

In procurement practices, when would you use a RFQ

What is double phase

200

Design risks can be 

What is cost estimations and design standards

200

Which delivery method could be the fastest

What is PDB

300

How many Design Build projects have TDOT completed?

What is 5

300

When would you use evaluation selection criteria 

What is shortlisting

300

Risk Registry starts in what stage of the project

What is Stage 1

300

Which two methods has opportunity for innovation 

What is DB, PDB, CMGC

400

What was the first major Design Build project at TDOT?

What is I-440 Reconstruction (2017)

400

Which method has procurement after the design phase

What is Design-Bid-Build

400

Which method has the least amount of risk on the owner

What is Design-Build

400

Which method marries the designer and contractor

What is CMGC