Defects
Machine Centers
Systems
Reprocesses
Quality Codes
100

Picture 1

Tacking


100

I can pull and stretch with tension multipliers up to 1930mm wide

TL1

100

I record information about coils that we send to the customer

PQI

100

After removing metal from the OD, I need to apply which sample label to the lab sample

BE sample label

100

my inner qualities will accept almost anything, as long as my surface isn’t broken

QG-05

200

Picture 2

Oscillation

200

Many strands and the widest gauge range in our facility

SL1

200

- I hold all information about coils, including completed steps and ones yet to come

KPS

200

When completing reprocesses you must enter information into what system?

PQI

200

I’m mainly used for structural components, cake pans and shovels

QG-18

300

Video 1

Wrinkles/Creases

300

Caustics, lubricants and levelling are some of the things I do

CL1

300

This is where you find all SOP’s and metal conditions

ETQ

300

If not sending coil to pack, and not rewinding I should do this

RTW

300

I’m one of the trickiest codes, as I can be exposed, painted or un-exposed

QG-17

400

Picture 3

Water stain

400

I use extreme heat and water to temper expectations

CASH

400

All information regarding shipping, receiving and customer specifications are stored here

SAP

400

All reprocess instructions are completed, but the coil does not need to be rewound. However, it does need to be packed. What do I do now

NOP

400

Used in make-up containers, and architectural applications

QG-16

500

Picture 4

Knife mark from unpacking

500

Squeeze me, stretch me, shape me where am I?

CM1

500

I have a library of defects, that are consulted as the sheet passes by my cameras

SIS

500

Instructions are to remove 50m for off gauge.Before removing coil from the line, what must you do?

Verify gauge

500

You see me on the outside of many vehicles on the road today

QG-06