This is considered a best practice and should be utilized prior to physical syncs
What is a virtual sync board
This is a tool that we should be using to track productive time
What is the BMI tool
This is the acronym for all types of waste
TIMWOODS!
This is a mechanism to evaluate our highest risk areas of the building
what is Gemba
A team that comes in early to set up for the next shift
What is the early bird team
This is a bucket that Outbound and other departments should not be coding to
What is admin related or what are ghosted hours
This type of waste is when we process more then what is needed
What is over production
Blank is the metric that measure the perception of safety in our building
what is SLI
Prior to exempting feedback you will need to collaborate with BLANK prior to exempting any feedback
What is a Sr leader
This meeting is important to understand what our space constraints are. All department heads should be attending
What is space management
This type of waste is the movement of "non people"
What is transportation
This type of preventative measure is worn by associates and managers daily
What is PPE
This type of mechanism is used prior to start of shift (hint) it is not the shift planner
What is a preshift meeting
A scrub that should be done weekly
what is a roster scrub
Scan to scan measurement of one step or one process
What is cycle time
This type of injury can be catastrophic and considered very serious
What is SI or Serious incident
This is a mechanism that all inbound should be following while unloading freight. Hint (starts with F and ends with o)
What is FIFO
A meeting that discusses the following
Previous day performance, Safety, current day plan, rates
what is the pre shift meeting
This formula is the formula for what metric "time available/Demand=Seconds
What is TaKT
This tool is used to evaluate safety risk across the building