11-140-5
SECTION 1
11-140-5
SECTION 2
11-140-5
SECTION 5
11-140-10
SECTION 2
GBU-32 SERIES WITH FZU-48 WEAPONS ASSEMBLY/DISASSEMBLY
100

What are the first 5 sections of the 11-140-5?

Introduction, Description, Configuration, BIT/Test, and Common Procedures. 

100

A MK.82/BLU-111 is filled with how many pounds of explosive charge? 

192 Pounds

100

How much thermal coating can a bomb have missing onboard a ship? 

Bombs with more than 56 square inches or one area greater than 15 square inches of thermal coating missing shall not be used afloat.

100

The FZU-32B/B turbine generator starts its function at air speeds greater than what? 

 133 knots.

100

GBU-32's utilize which KMU kit? 

KMU-559

200

What is a warning? 

An operating procedure or practice which, if not correctly followed, could result in personal injury or loss of life.

200

A MK.83/BLU-110 is filled with how many pounds of explosive charge? 

445 Pounds

200

What is the shelf life of a BSU-85? 

20 Years

200

How many pounds of explosive filler does the BLU-126 have? 

27 pounds

200

The DSU-33 Sensor will not fit flush with the fuze well. Approximately how much space between the sensor and bomb fuze well is acceptable?

1/4 inch

300

What is a caution? 

An operating procedure or practice which, if not strictly observed, could result in damage to, or destruction of, equipment.

300

A MK.84/BLU-117 is filled with how many pounds of explosive charge? 

945 Pounds

300

When using MK 122 switch in conjunction with MK 84 bomb bodies, what mods must be used? 

MK 84 MOD 6 or 7

300

What explosive filler is used inside a BLU-129?

MNX-1282

300

KMU-559 tail assemblies weigh approximately how many pounds? 

84 pounds.

400

What is a note?

An operating procedure or condition which it is essential to highlight.

400

What sub caliber practice bombs does the navy use?

MK.76, BDU-48, and BDU-33

400

A reaction of varying intensity which occurs when an energetic material (propellant/explosive) is exposed to intense heat for a significant period of time is called what? 

Cook-off

400

The GBU-12F/B is a dual mode weapon that incorporates GPS guidance using the _____ vice the MAU-169, MAU-209 or WCU-10.

WGU-53/B

400

FZU-48 initiators dropped in excess of what distance while out of container shall be considered unserviceable?

One foot

500

What does the term ensure mean? 

Used in prefacing inspection steps or procedures and meaning that if the criteria is NOT met, the technician should do all in his power to fix the discrepancy.

500

What adaptor is required to install signal cartridges MK.4 and CXU-3 in the tail fuze well of an inert bomb? 

MK.89 MOD 0

500

In the event of a conflict between the NA 01-1A-75 and procedures found in this publication on cleaning and corrosion removal procedures, what procedures take precedence?  

NA-01-1A-75 shall take precedence.

500

How much does a BDU-59 weigh? 

89 lbs.

500

How many setscrews does a KMU-559 have? 

Eight setscrews

600

What does the term verify mean? 

Used in prefacing inspection steps or procedures and meaning that if the criteria is NOT met, reject item.

600

The DSU-33 uses what kind of radar? 

Doppler

600

What is the drop criteria for a DSU-33 in the container and out of container? 

3 feet in container. 6 inches out of container.

600

The ADU-892/E computer test set adapter is used in conjunction with the CMBRE to test what? 

The Laser portion of the WGU-53/B Guidance Kit.

600

What does LDAT stand for? 

LOW DRAG ARM TIME

700

What is a NAR? 

Notices of Ammunition Reclassification (NAR) are issued initially by message and inserted in NAVSUP P-801 at each change or revision.

700

What bomb fin provides the aircraft with a capability of retarded (high-drag) low altitude, high speed delivery or unretarded (low-drag) bomb delivery.

BSU-86 Fin.

700

What is the drop criteria for a CXU-3A/B in the container and out of container?

18 inches in container. Any distance out of container.

700

Adding a DSU-38 to a GBU-38 creates what bomb? 

GBU-54

700

What will happen if the LDAT switch is set to the “X” position when the FZU-48 is utilized? 

The weapon will dud.

800

What is the Navy Transportation Safety Handbook for Hazardous Materials publication? 

NAVSEA OP 2165 (Vol. 1)

800

How many mounting holes does the MHU-191 munitions transporter have? 

52 mounting holes

800

What is the service life of a MK 77 after being filled with fuel? 

6 Months

800

The BLU-117C/B utilizes what explosive filler?

AFX-795

800

Can one person install a fuze when building the GBU-32?

Yes, however two persons are preferred for ease and speed of installation.

900

What is the Aircraft General Purpose Bombs, Fire Bombs, Practice Bombs and Components publication?

NAVAIR-11-5A-17

900

What is designed to provide better penetration of hard targets without the likelihood of the nose plug shearing during oblique impact?

MXU-735/B

900

How is service life calculated? 

Service life shall be calculated from the date the component is removed from the container and installed in All-Up-Round (AUR).

900

The DSU-33 has a Height of Burst (HOB) of how many feet? 

20 feet nominal

900

When installing the power cable on the DSU-33 sensor can you use pliers or any other tools on the shell?

No, The use of tools could damage internal parts which may cause sensor to malfunction.

1000

What is the OPNAVINST 8000.16D?

Naval Ordnance Management Policy (NOMP)

1000

What suspension lugs are used with the MK 84 Series and BLU-117 general purpose bombs?

MK 3 MOD 0

1000

When installing a M-70 series cable, a minimum of how many turns should be made in both legs of the cable? 



A minimum of 6 turns is required and should be made in both legs of the cable, as close to the charging well plug end junction of both cable legs as possible.

1000

The Mk.4 produces heat exceeding how many degrees Fahrenheit?

2,500

1000

The arrow on top of the FZU must be pointed which in what direction?

Towards the nose of the bomb.