100

What chapter of the ADS speaks to MEL at USAID?

Chapter 201
100

What measures factors outside control of USAID that have potential to affect achievement of results?

Context Indicator

100
What are USAID's Data Quality Standards?

VIPRT

100

Name USAID's Evaluation Principles.

-Integrated into project/activity/strategy design.
-Unbiased
-Relevant
-Based on best methods
-Oriented to reinforce local ownership
-Transparent

100

Evaluation Purpose = __________________.

USE and USERS!

200

How does USAID operationalize adaptive management?

CLA

200

What MEL Plan is associated with the Intermediate Result (IR)-Level?

PMEL Plan

200
Identify 2 Pros and 2 Cons of using a survey as a data collection instrument.

Pros:
High Representation
Convenient Data Gathering
Good Statistical Significance
Little or no Observer Subjectivity
Precise Results

Cons:
Inflexible Design
Not Ideal for Controversial Issues
Possible Inappropriateness of questions
Survey Fatigue
Lying


200

What type of questions do a Performance Evaluation answer? 

Descriptive
Normative
Cause and Effect

200
What type of designs would you use for an Impact Evaluation?

Experimental
Quasi-Experimental

300
Name 2 institutionalized mechanisms USAID uses for adaptation.

Portfolio Reviews
Mid-Course Stocktaking

300

"# of farmers trained" is what kind of indicator?

Output Indicator

300
Name 4 things you should consider when selecting targets for your indicator.

Life cycle of the activity
Output vs. Outcome
Stakeholder Expectations
Historical data trends
Achievement of similar programs
Research findings
Assessments done
Seek opinion of experts

300

What are USAID's Evaluation Requirements?

1. 1 Evaluation Per Project
2. 1 Impact Evaluation per pilot, if feasible
3. 1 Whole-of-Project Evaluation per CDCS

300

What type of Evaluation at USAID uses a Non-Experimental Design?

Performance Evaluation

400

What measures progress towards expected outputs and outcomes of strategies, projects or activities?

Performance Indicator

400

What are USAID's Characteristics of Good Indicators

Objective
Practical
Useful for Management Decisions
Direct
Attributable to USAID
Timely
Adequate

400

When is a DQA required?

Indicator is reported externally

Every 3 years or within 12 months if indicator is new

400
What can be conducted to determine the extent to which a project or activity is ready for an evaluation?

Evaluability Assessment

400

What is required to procure an external evaluation at USAID?  

SOW

500

What are USAID's Program Cycle Principles?

1. Use Evidence Based Decision Making

2. Learn and Manage Adaptively

3. Ensure Local Ownership

4. Use a Range of Approaches

500

"Description," "Plan for Data Collection," "Targets and Baseline," and "Data Quality Issues" are key sections of what USAID document?

PIRS

500

Comparing indicator data up and down the result chain is called _______.

Vertical Comparison

500

What is an Impact Evaluation?

Rigorously defined counterfactual

500
What are the 8 key components of an Evaluation SOW?
Purpose

Summary Info
Background
Evaluation ?s
Design & Methodology
Team
Schedule/Logistics
Budget