LIGHTING
HVAC
START UP
GENERAL INFO
HEP AND BATTERY
100

Number of digits allowed on the number light.

What is 4?

100

Number of speeds for the HVAC blower fan.

What are 3?

100

Number of seconds needed to force start the locomotive.

What is 10 seconds?

100

Number of detachable roof sections.

What are 4?

100

Traction motor number used for back up HEP.

What is traction motor number 3?

150

Number of Desk/Console lights found in the cab.

What is 5?

150

Name of the 2 heat exchangers found on the HVAC unit. 

What is the condenser and evaporator?

150

The first button pushed in order to start up the locomotive.

What is Battery Control?

150
Fuel used in the aftertreatment.

What is DEF?

150

Name of the button to open and close the front 480v receptacles. 

What is Autolooping?
200

Number of seconds the steps light are on for after being activated. 

What is 120 seconds?

200

Number of filters found on the HVAC unit and cab heater.

What is 2?

200

Number of fuel Cutoffs switches found on the locomotive.

What are 6?

200

MPH needed before the horn can be used?

What is 3mph?

200

Number of total battery cell packs found on the locomotive.

What are 32 cell packs?

250

The 2 positions on the crossing light switch.

What is ON and FLASH?

250

Voltage provided from the HVAC unit to the cab heater.

What is 24vdc?

250

Name of the switch with the options RUN, ISOLATE, START, and STOP.

What is the isolation switch?
250

Voltage supplied to the refrigerator.

What is 74vdc?

250

HEP selector switch position for when HEP is supply from ground power.

What is Feed In?

300

Number of ditch lights found on the rear. 

What is 0?

300

Type of refrigerant found on the HVAC unit.

What is 407c?
300
Position of the Master Controller before starting the locomotive. 

What is 0?

300

The 3 positions for the cab door handle.

What is Open, Closed, and Pressure Lock?

300
Battery charger selector switch position for when HEP is provided from its own locomotive. 

What is the HEP Inverter?