Risk is the product of these two criteria, exactly what is quantified in a risk matrix.
What are severity and likelihood?
We are producing SLCAs for this project as opposed to LCAs primarily due to this constraint.
What is time?
This type of engineering drawing can be analogous to folding a box into your design. Despite it's name, more sides can be added if necessary for clarity!

What is third angle projection?
The following drawing is not isometric because it fails this condition?
What is all horizontal axes at 30 degrees?
A dollar sign indicates this type of reference.
What is absolute?
What is body language?
While external risks are unfortunately uncontrolled, these two main types of risks that a team are in a team's control.
What are strategic and preventable?
This step, which comes between inventory analysis and interpretation, is missing from the following list of LCA steps.
1. Goals and definitions
2. Inventory analysis
3. Interpretation
What is impact assessment?
This engineering drawing suffers from this classic blunder, which can actually make a drawing more confusing! 
What is over-dimensioning?
A system which is socially equitable or built with locally available resources is more likely to be this.
What is resilient?
What is the original level + (flow rate in minus flow rate out) * the time step?
A team member wants to give constructive feedback to their teammate, but realizes that the receiver just bombed the Physics 158 midterm and is currently reevaluating his self-worth. By delaying the feedback until later, the sender is emphasizing this C from the 3x3 model.
What is considerate?
This blue highlighted risk is in the wrong position, and should instead be placed in strategic project management.
What is the redesigned rotor?
Though SLCA's are qualitative, much easier, and cheaper than traditional LCA's, it has been suggested that SLCA's still capture this percentage of the issues that a full LCA would identify.
What is 80%?
All dashed lines show the hidden features of a drawing, but this special type of dashed line (l- ---- - ---- -) signifies one thing in particular.
What is the center of a hole?
The relationship between volume of material removed in a mine and depth scales according to this relationship.
What is proportional to the cube of depth?
For the following equation modelling water flowing out of a bucket, V is in liters, t in minutes, and R in ml/s. This value of k is the one that balances the units in the equation.
V = k * R * t
What is 0.06 L * s / ml * min?
What is a considerate message?
Successfully mitigating a risk brings us back to this initial stage of the risk management flowchart.
What is identify risks?
What is xxxx distance travelled.
Extension lines may cross in the dimensions of a drawing, but these lines may not.
What are dimension lines?
When choosing a range for a risk matrix, any choice is theoretically possible, so long as this fatal mistake is not made.
What is including 0?
What is v = sqrt(2gh)?
Across the 3x3 feedback model, all of the 7 C's are used except for these two. Hint: Donald Trump's State of the Union Address yesterday could probably have benefited from these two the most!
What are correct and concise?
What are time and budget?
This value is defined sum of the values in an SLCA, and can inform us about the environmental impact of an option.
What is an environmentally responsible product rating (RERP)?
The hole in this drawing is over-dimensioned because of this.
What is 20 diameter and R20 (same measurement)?
A team member who is determined to get their way on an issue will employ this conflict management style.
What is competing?
The if statement
=if($B$2 > 4, no, if($B$2 < 1, no, yes))
returns this if the value in cell B1 is 4
What is yes?
While the message should of course be considerate of the recipient, it should also emphasize these two "sister C's" that ensure the message is effective.
What are complete and concrete?
A team which neglected to ensure their claw works with the provided pulley is guilty of this risk type.
What is operational?
The RERP for this SCLA.

What is 28?
What is orthographic projection?
The given list of the stages of a mining project is missing this important late stage.
1) Exploration 2) Approval 3) Construction 4) Operation 5) Closure
What is remediation?
For the equation shown in cell F13, this would be the resulting change if the equation were changed to =($D13 - $E13)

What is no change?
Both the sender and the receiver of feedback should be clear and courteous, but while the sender should ensure their message is considerate, the receiver should instead prioritize this C, which includes acknowledging that the feedback was heard.
What is complete?