Solar
Stormwater
Environmental
That Top thing
Use your fingers
100

What best describes solar altitude?

The angle of the sun above the horizon

100

Which strategies can be used to reduce storm-water runoff?

Create rain gardens

Use pervious pavements

Create on-site retention and detention ponds

100

Gravel and sand are ill-suited for what use? 

Landscaping

100

On a topographic map, a slope is represented with contour lines that are spaced closer together at the lower elevations. Which landform would this represent?

Convex slope 

100

The maximum building square footage allowed on the site is 80,000 sq ft and the site is 20,000 sq ft. What is the FAR for the site?

FAR = 80,000 / 20,000

FAR = 4:1

200

What is the advantageous property of brick that makes it suitable for use in passive solar energy application?

High thermal mass

200

What are the advantages of swale infiltration systems?

economical

increased filtration/recharge

reduces run off velocity

easy to maintain

more natural apperance than curbs

200

Contamination is found in the unsaturated soils on site. The owner has chosen a method of remediation which invloves removing the contaminates form the soil and treating them above ground. What is the method called?

Soil vapor extraction (SVE)

200

What two things does a topographic map show?

Contours and slope of the land

200

Design Concept: 50 seat restaurant /// Net Area needed for dinning area: 17 sq ft per seat /// Net Area needed for kitchen space: 5 sq ft per seat

What should be the total net area needed for the restaurant and kitchen?

50 x 17 sq ft = 850 sq ft 

50 x 5 sq ft = 250 sq ft 


850 + 250 = 1,100 sq ft

300

What statement is true the higher the Solar Reflectance Index (SRI) value? 

The higher the SRI value, the better the material's chances of reducing the heat island effect

300

What are dry wells?

Small excavated pits backfilled with aggregate like - infiltration swale.

300

What three areas are the most likely place where lead might be a concern?

Why is lead considered a hazardous material?

Existing paint, drinking water, existing pipes.

It can cause neurological disorders and birth defects

300
The closer the contour lines is, the _______ the slope

Steeper

300

Design Concept: 50,000 sq ft of land area and 10,000 sq ft of gross building floor area

Require ratio of 3 sq ft of parking area to 1 sq ft of gross building area.

How many parking spaces are required at 400 sq ft/car?

3 sq ft * X / 1 sq ft * 10,000 sq ft

X = 30,000

30,000 sq ft / 400 sq ft = 75

The project land area is not required to answer the question.


400

What is one disadvantage of a trumble wall system?

Does not supply good daylight

400

What type of storm water infrastructure is ideal for residential settings and planted islands in parking lots?

Rain gardens

400

What is a Phase II ESA? 

Phase II is performed when Phase I investigation concludes there is environmental contamination. Samples are collected and analyzed.

400

Slope  = ?

rise / run

400

Design Concept: Hospital has 20,500 sq ft in net area /// 30,000 sq ft in gross area

What is the efficiency of the building?

Efficiency = 20,500 sq ft / 30,000 sq ft

= 68.33% ~ 68%

500

The measurement of reflected radiant energy received on a surface is known as? 

Albedo

500

Where are two places the water comes from in rainwater harvesting?

Yard and roof 

500

In what two ways can the health risks of asbestos found in building renovation be avoided?

Abatement (removing) or encapsulating (sealing)

500

What do rings of consececutively smaller contours represent?

Mountains or hills 

500

Design Concept: 50 person office /// Net Area per office staff: 175 sq ft

What is the total gross area of the building to meet the goal of 75% building efficiency?


Remember: Efficiency = Net s.f. / Gross s.f.

75% = (50*175) / (?)

(?) = (50*175) / 75% = 11667.67 sq ft