TIRE AND WHEEL
ELECTRICAL
NAMP 4790.2E
PUBS
CODES
100

WHAT IS THE TIRE AND WHEEL PUBLICATION.

NA 17-1-129

100

WHEN WORKING ON ELECTRICAL EQUIPMENT WHAT ITEMS NEED TO BE REMOVED FROM YOUR PERSON BEFORE YOU START WORK?

ALL METAL AND CONDUCTIVE ITEMS IE: WATCHES, BELTS, METAL RINGS, ETC.

100

WHAT IS 4790/64

Support Equipment Transaction Report

100

WHAT IS THE CORROSION PUBLICATION?

17-1-125.

100

WHAT IS ACTION TAKEN CODE "Z"?

CORROSION TREATMENT
200

WHAT SHOULD A TIRE BE INFLATED TO FOR STORAGE PURPOSE?

50% OF SERVICE PRESSURE OR 15 PSI (WHICHEVER IS LOWER).

200

WHAT IS THE RATED CAPACITY OF THE A/M24M-6 AC SIDE.

120 KVA, 115/200 volts, 3 phase, 400 Hz

200

WHAT ARE THE PRINCIPLES OF THE TOOL CONTROL PROGRAM?

Standardization of tools and the configuration of tool containers.

Traceability of tools through the use of unique identification numbers.

Strict accounting of tools.

200

WHAT IS A TPDR? 

Technical Publication Discrepancy Report

200

WHAT IS WORK UNIT CODE (WUC) 090 USED FOR?

NON AVIATION EQUIPMENT

300

WHAT IS THE PUBLICATION FOR THE TIRE INFLATOR KITS AND WHAT DO YOU VERIFY BEFORE YOU USE THE INFLATOR KIT?

NA 17-1-123, VERIFY CALIBRATION AND THE WHITE O-RING ON THE FITTING.

300

WHAT ARE THE POWER INPUT REQUIREMENTS FOR THE A/M24M-5A? HOW MANY OUTPUTS AND WHAT ARE THEY?

INPUT (440/220 VAC, 3-phase, 60/50 Hz)

3 OUTPUTS

115 VAC (115 VAC, 3-phase, 400 Hz)

28 VDC (28VDC 14KW Continuous)

270 VDC (270VDC 72 KW CONTINUOUS)

300

WHAT ARE THE 4 DIFFERENT TYPES OF AUDITS?

PROGRAMS, QA, WORKCENTER, SPECIAL

300

WHAT IS THE LAST 2 DIGITS ON A PUBLICATION FOR AN MRC CARD ON SE?

6-2

300

WHAT IS MAL CODE "105"

LOOSE, MISSING, FAULTY

400

HOW DO YOU FIND THE TORQUE SPEC OF A NUT IAW NA 17-1-129?

VERIFY THE THREAD SIZE TO THE WRENCH

400

WHAT IS THE DIFFERENCE BETWEEN A WIRING DIAGRAM AND A WIRING SCHEMATIC?

DIAGRAM SHOWS THE INDIVIDUAL COMPONENTS

SCHEMATIC SHOWS YOU WHERE THAT INDIVIDUAL WIRE LEADS TO.

400
WHAT IS A CODR AND HOW LONG DO YOU HAVE TO REPORT A CODR?

Conventional Ordnance Discrepancy Reports, 24 HOURS

400

WHAT WP OF THE 17-1-125 COVERS PRESERVATION AND DEPRESERVATION?

WORK PACKAGE 11

400

WHAT IS THE ONE JOB STATUS CODE THAT DOES NOT SHOW UP ON THE BMT AND WHAT DOES IT MEAN?

M9 

AWAITING FUNDING

500

HOW LONG DOES A TIRE STAY IN THE INFLATOR CAGE DURING PRESSURE TEST?

10 MINUTES.

500

WHAT DOES A TRANSFORMER RECTIFIER DO ON A A/M24M-6?

CONVERTS THE AC POWER PRODUCED FROM THE GENERATOR INTO DC POWER.

500
WHAT IS THE DIFFERENCE BETWEEN A CAT I PQDR AND A Y CODE?

CAT 1 PQDR will be submitted for quality deficiencies with the potential to cause death, injury, or severe occupational illness; or result in a production line stoppage at original equipment manufacturer (OEM). 

Y CODE is a supply turn in issued from an I-level installation.

500

WHAT WORK PACKAGE IN THE PUBLICATION COVERS TROUBLESHOOTING STEPS?

WORK PACKAGE 6

500

WHAT IS TRANS CODE WHEN COMPLETING A TD(TECHNICAL DIRECTIVE)?

41