Emergency Safety
First Aid Safety
Heat Safety
Personal Protection Equipment (PPE)
Construction Safety
100

When a fire alarm activates, personnel must walk to this location outside the building.

What is the designated assembly area?

100

This is the minimum number of first aid kits required per site.

What is one?

100

This is the recommended amount of water workers should drink per hour in hot conditions.

What is approximately 4 cups per hour?

100

What PPE is required to enter the Red Zone?

What Is:
Eye Protection
Ear Protection
Safety Shoes
Hand Protection
Head Protection

100

This type of footwear is required on all AWS construction sites to protect against falling objects and punctures.

What is Steel or Composite Toe Safety Boots?

200

This person is responsible for providing instructions on exiting a building at the closest emergency exit during an emergency.

What is the Incident Commander (IC)?

200

For a shift with 51 or more workers, this is the minimum number of trained First Aid Providers required.

What is two?

200

This is the body's natural cooling mechanism that requires adequate hydration to function properly.

What is sweating?

200

Safety shoes at AWS must have this type of toe protection.

What is composite or carbon-fiber toe?

200

This is the milestone where the General Contractor provides controlled access to allow network cabling and turn-up activities.

What is Network Early Access (NEA)?

300

This is the first person to contact when a safety incident occurs.

What is the on-shift First Aid Provider/Manager?

300

AEDs should be located next to this other piece of emergency equipment where possible.

What is a First Aid Kit?

300

This is the least severe heat-related illness, caused by excessive sweating blocking sweat glands.

What is Heat Rash?

300

These are the THREE conditions ALL PPE must maintain at ALL times to be effective.

What is comfortable, clean, and well maintained?

300

Before using a ladder, workers must perform this type of check to ensure it is safe to use.

What is a pre-use inspection?

400

These are the FIVE pieces of emergency equipment that must be present and accessible at ALL AWS data center sites.

What is fire extinguishers, first aid kits, AEDs, eyewash stations, and emergency evacuation maps?

400

First Aid Providers must be recertified every this many years.

recertified every this many years.What is two years?

400

These are three commonly hot areas within an AWS facility.

What is hot aisles, generator enclosures, and loading docks?

400

This type of vest is required when working in areas where forklifts or heavy machinery operate.

What is a High-Visibility Safety Vest?

400

This is the final stage of construction where the facility is handed over to the operations team.

What is Power Facilities Hand Off (PFHO)?

500

When a safety incident occurs, ALL personnel in the immediate area must do THIS first before anything else.

What is stop work to determine if any active hazards are present?

500

This is the maximum response time for first aid to be accessible after an incident.

What is 3-4 minutes?

500

These are the five signs and symptoms of heat stroke.

What is high body temperature, lack of sweating, hot and red skin, rapid pulse, and disorientation?

500

This type of clothing is required when performing energized electrical work.

What is Arc Flash Suit or Flame Resistant (FR) Clothing?

500

These are ALL seven minimum PPE requirements for entering an AWS construction zone.

What is hard hat, safety glasses, high visibility vest/shirt/jacket, safety footwear, task-specific gloves, long pants, and shirt with minimum 3" sleeves?