Data Collection Tools
Roles and Responsibilities
ATOS
Hodge Podge
Safety Attributes
ATOS Modules
100
This can only be selected for the last activity before saving an EPI to the master record.
What is Not Observable (N/O)?
100
This person organizes and coordinates SAI team activities.
Who is the Team Coordinator?
100
Accuracy, Objectivity, Value Added.
What are three of the Data Dimensions?
100
This safety attribute can be delegated.
What is Authority?
100
The ASI accesses assigned EPI's, SAI's and ConDor's
What is module 4&5 Data Collection and Reporting?
200
This tool is used to assess the air carrier's performance.
What is an EPI?
200
During planning, this person provides specific instructions for data collection.
Who is the PI?
200
5 working days.
When should an ASI save an activity to final?
200
Examples of this safety attribute are data system backups, authorized signatures, final review, and flags.
What are controls?
200
The ASI can enter comments in the element field for PI consideration
What is module 2 Planning?
300
This tool is used to assess an air carrier’s system design.
What is an SAI?
300
Reviews ATOS records in accordance with the Data Quality Guidelines.
Who is the Data Reviewer/DEPM?
300
These are the three major functions of ATOS
What are Design Assessment, Performance Assessment, and Risk Management?
300
Examples of this safety attribute are CASS programs and air carrier safety programs (IEP).
What are examples of process measures?
300
The ASI can find the results of previous DA's and PA's
What is mod 7 Analysis and Assessmet & 8 Action, Determination and Implementation (ADI)?
400
This link in ATOS provides the most current version of the DCT.
What is FSIMS?
400
Accurately and promptly enters data collection results into the ATOS database.
Who is the ASI?
400
Required briefing provided at the office to an inspector recently assigned to the CMT.
What is the Air Carrier-Specific Familiarization Briefing?
400
This safety attribute requires a clearly identifiable, knowledgeable person who is accountable for the process.
What is Responsibility?
400
Where the FLM assigns work.
What is module 3 Resource Management?
500
This tool is created by the PI to collect data on specific areas of immediate concern outside of the CAP.
What is a ConDOR?
500
ACAT comments from this individual can only be entered in the elements field.
Who is the ASI?
500
Defines the intent of the element and scope of the operator's responsibility.
What is the DCT purpose statement?
500
This safety attribute looks for interrelated processes located within an air carrier system.
What are interfaces?
500
Where the third level of data validation happens.
What is Module 6 Data Review?