What is the process of acquiring or obtaining Generation Supply for PECO customers called?

Procurement

100

What does a kWh (kilowatt-hour) measure?

The total amount of electricity used over a specific time

100

What does the Customer Charge cover?

Cost of billing, 

Cost of meter reading, 

Cost of equipment and maintenance

100

What type of service do most GS customers have?

Primary Service

100

Which tool can be used  to provide you with more detailed information on usage?

Uplight

200

What is a key difference between single phase and polyphase (3-phase) service?

Polyphase service always has an additional wire to maintain continuous current flow

200

What is the main purpose of a Transformer Rated (T-Rated) Meter?

To reduce the amount of electricity before it flows through the meter

200

What information should be included to answer "How" when documenting a commercial bill explanation?

The outcome for the call

200

What is the minimum demand for PD and HT customers?

25 KW

200

What is the minimum number of accounts a customer must have to be eligible for Summary Billing?

5

300

Which department monitors and resolves High Bill Disputes?

Customer Relations

300

What does a Power Factor (PF) of 1 indicate?

100% Efficiency

300

What is the maximum demand for devices eligible for Rate TL-CL?

1.2 KW

300

If a rate change occurs during a billing period, how are charges calculated?

By prorating charges based on the number of days each rate was in effect

300

When processing a dispute related to Meter Mix-Up, you must inform the customer that there is a ____-day investigation timeframe.

30

400

What is the primary function of the Master Account in a Summary Billing setup?

To consolidate billing for linked accounts

400

What could cause supplier charges from a previous month to appear on the current bill?

Delayed supplier charges

400

What is required if a caller does not want the RS rate at a premise where it already exists?

A Service and Meter application must be submitted

400

To be eligible for virtual metering aggregation, the individual accounts must ________________ and meters must be  within two miles of the host’s property line and within PECO’s service territory.

Be in the same name

400

What is the timeframe for the technician’s appointment to investigate foreign wiring disputes?

7am–3pm, Monday through Friday

500

What type of meter setup allows a single device to measure both energy usage and excess generation?

One bi-directional meter

500

What is the purpose of the Gas Migration Rider?

To recover purchased gas costs (PGC) from customers who switch to a Natural Gas Supplier (NGS)

500

What is net usage in a customer's net metering bill?

Electricity supplied by PECO minus electricity generated by the customer

500

Who should handle disputes related to foreign wiring/piping, meter mix-up, or rate changes for GS Primary, HT, PD, TSF/TSI, and TCS rates?

Large Commercial Services (LCS)

500

What email address should be used to request adding or removing accounts from a Summary Bill?

PECOBilling-LCSRequests@exeloncorp.com