how long is a gas free certificate good for?
8 hours
what are the three part designation sequence to identify valves?
1. shaft or plant number
2. system designation valve number
3. valve number
What are the 3 parts of an EOSS?
The EOSS user guide, EOP, EOCC
after normal working hours, who is charged with the safe and proper operation of the ships engineering plant in port
Engineering duty officer
which valve is susceptible to damaging from fluid slapping its components if used for throttling
gate
supervisors should inspect spaces to make sure they are locked or properly manned
Randomly
material used to seal fixed joints
gasket
What chart helps keep track of what equipment is on line?
status chart
What is a normal duty of a cold iron watch?
taking readings on equipment
atmospheric pressure
14.7
Threaded fastener require what type of inspection
Periodic
measures difference between two separate joints; two tubes, one needle
differential gauge
ORM stands for
Operational risk management
Who do you report to for security violations?
OOD & CDO
COLOR:
Nitrogen
Light gray
how long are operational logs maintained for?
6 months
what types of valves are small, spring loaded, and designed to give an AUDIBLE warning of dangerous pressure?
sentinel valve
What is the purpose of the EOCC?
Procedures for responding to and controlling commonly occurring casualties
Commanding Officer
Indicates grade 6
4 lines
How long are engineering legal records retained onboard for?
3 years
metal lagging
used for pipes that will be walked over
Where is the master copy of the EOSS located on board your ship?
Engineering log room
What in port watch is responsible for the physical security of the ship and takes control of security forces in the event of a security alert?
Used for the purposes of restoring damaged threads in castings or forgings
Thread inserts