What should the rotation of the Ground Mount system be set at in Aurora?
What is: 180 degrees (south facing)
How much of the potential trenching is covered by Everlight?
What is: 70 ft.
If a detached garage/shed is not a far distance from the house (next door/backyard), would we need to draw a potential trenching path?
What is:
Yes, always👍
What do we call a system with panels on both the house and a ground mount system?
What is:
Hybrid System
True or False:
There is a limit to how many panel columns we can include in a ground mount system before splitting into separate ground mounts.
What is: False, no limit
How far should we place Ground Mount systems away from fences, gates, or property lines?
What is: 10 ft.
What can we NOT trench through?
What is: Driveways/Concrete
Scenario: This opp has the option to place panels on both the house and the detached shed. Where would we prioritize placing panels first based on the layout below? 👇
What is:
The shed (Still prioritizing southern exposure, in this case, the shed is preferred with lots of room on the SE roof face and minimal shading)
When working on an opp with multiple meters, what needs to be done in SalesForce?
What is:
Check "Electrical Upgrade" box under System Add Ons and communicate to EC in SF chatter.
True or False:
We can install this ground mount system.
What is:
False, ground mount systems are 4 rows high (no more/no less).
For a ground mount system with Alliant, if a system will produce at either 88% or 108% (since we can’t reduce panels by just one), which option would we go with?
What is: 108% (and report at 98%)
Which would be preferred as a potential trenching path?
A:
B:
A: 
Can we install this layout on a detached structure (MN)?
What is:
Yes, we can ignore setbacks on detached structures!
During the design review process, you are made aware of the exact location of the meter. Should you adjust your potential trenching path to reflect the exact location?
What is:
Yes, adjust your proposed trenching path to be as accurate as possible.
True or False:
In the event that there are two meters on a duplex, we do a meter consolidation.
What is:
False
("bonus" available if you can explain why ( ͡° ͜ʖ ͡°) )
Ground Mount systems are a minimum of ___ rows high.
What is: Fo' (4)
Which would be preferred as a potential trenching path?
A:
B:
B:
Can we install this layout on a detached structure (MN)?
What is:
Yes, we can ignore setbacks on detached structures!
Working with an opp that has multiple meters and separate graphs for each one, how would we go about inputting the usage into Aurora?
What is: Combine the kWh from both graphs into Aurora.
True or False:
Based on the info provided in the design notes for this opp, meter consolidation is needed.
What is: False
What is the tilt and panel orientation of a Ground Mount system?
What is: 26 degree tilt and landscape orientation.
Which would be preferred as a potential trenching path?
A:
B:
B:

Scenario: This opp has the option to place panels on both the house and the detached shed. Assuming both of these layouts produce the same and both systems utilize the same number of panels. Which would be the preferred option?
A:
B:
B:
How should the one-line look for Xcel Solar Rewards?
What is:
The one-line should reflect:
Net Meter --> AC Disco --> PV Disco --> Combiner
True or False:
The customer has already trenched to connect the detached structure, so no trenching is needed.
What is: False (trenching always)