6D BIM Modeling refers to..
Lifecycle information
The first trade in the sticky-note activity we did
Structures/ foundation work
BF in critical chain project management is
Buffer
When components of a building are not spatially coordinated and conflict it is called
Clash -clash detection
The project we used for the sticky-note activity was a
Two-story house/ villa / residence
You generate in monte Carlo simulation ..
Random numbers
The only G7 country without a national BIM mandate ..
Canada
During the first activity on MS project, we planned and scheduled the tasks for the highway bridge in a … (scheduling format)
Work breakdown structures WBS / levels
PERT analysis and Monte Carlo simulation are considered a non-deterministic scheduling or a ..
Probabilistic
BEP IN BIM is…
BIM execution plan
Earned value is also expressed as
Budgeted cost of work performed BCWP
The distribution used in PERT analysis for PROJECT duration
Normal distribution
The round tripping inside one domain and sharing the same information across teams is called
BIM interoperability
When doing the earned value analysis in MS project, the actual measurements of % progress was recorded in which column? (not % complete but..)
Physical % complete
Monte Carlo simulation is used for estimating
Probability of finishing on Schedule / budget