BIM
LABS
Uncertainty
100

6D BIM Modeling refers to..

Lifecycle information

100

The first trade in the sticky-note activity we did

Structures/ foundation work

100

BF in critical chain project management is

Buffer

200

When components of a building are not spatially coordinated and conflict it is called

Clash -clash detection

200

The project we used for the sticky-note activity was a

Two-story house/ villa / residence

200

You generate in monte Carlo simulation ..

Random numbers

300

The only G7 country without a national BIM mandate ..

Canada

300

During the first activity on MS project, we planned and scheduled the tasks for the highway bridge in a … (scheduling format)

Work breakdown structures WBS / levels

300

PERT analysis and Monte Carlo simulation are considered a non-deterministic scheduling or a ..

Probabilistic

400

BEP IN BIM is…

BIM execution plan

400

Earned value is also expressed as

Budgeted cost of work performed BCWP

400

The distribution used in PERT analysis for PROJECT duration

Normal distribution

500

The round tripping inside one domain and sharing the same information across teams is called

BIM interoperability

500

When doing the earned value analysis in MS project, the actual measurements of % progress was recorded in which column? (not % complete but..)

Physical % complete

500

Monte Carlo simulation is used for estimating

Probability of finishing on Schedule / budget