DOUBLE JEOPARDY
O&M 65
O&M 66
Service Guard
O&M 7 Basics
100

The gauge scale should be ______ of actual test pressure

150%

100

What is Purging?

Purging is the systematic replacement of one material, usually gas, with another, usually air or an inert gas.

100

How many plans does Service Guard offer and prices?

One Plan - Comfort Bundle for $23.99  addition appliances added with Comfort A La Carte

100

What is the newest Effective Date for OM 7?

10/30/2019

200

Plastic service line less than 2" must be charted at?

1000ft

200

What method should be used while purging lines that are over 4" in diameter?

Displacement Method

200

What 6 appliances are covered under Comfort Plan?

Furnace (natural gas, electric or propane) 

Central Air Conditioner or Air to Air Heat Pump and ductless mini split 

Boiler System (natural gas or propane):* 

Fireplace, or Stove, or Insert (natural gas, electric or propane), 

Water Heater (natural gas, electric or propane):* Tankless Water Heater (natural gas or propane):* 

Cooking Stove/Range (freestanding or countertop or oven) (natural gas, electric or propane):* 

See Terms and conditions for more detailed information.

200

Who is the originating department?


 Gas Engineering, Standards Compliance 

300

Is re-pressurization necessary if the pressure drops to the minimum test pressure due to thermal contraction?

Yes

300

When Purging lines under 4" in diameter what method should be used?

Dilution Method

300

When does coverage begin after signing up? 

Immediately if appliances are in WORKING CONDITION ONLY!!!

**NO 30 DAY WAITING PERIOD** 



300

What is the official name of OM 7?


 Damage Prevention and Public Education 

400

In Class 1 or Class 2 locations, if there is a building intended for human occupancy within 300 ft of a pipeline a __________test is required.

Hydrostatic

400

Before pressurizing the line, what should all purge points have properly installed?

Venting

400

When closing out my Comfort Plan order. What comments should I include? and why? 

Labor-Hours worked and marked up parts prices.

If customer cancels before their 1 year commitment, they will be responsible for the cost of all service claims made on their behalf less all paid monthly premiums or the balance of the initial 12-month term premium, whichever is LESS. 

400

On which page would you find the Regulations?

Page 15

500

What is the minimum weekday after hour labor charge on a hit meter plus each additional hour?

$165 for the first two hours

$82.50 additional

500

A steel service line which is to be operated at a pressure of less than 1 psig must be tested to at least______


10 psig

500

What safety precautions should be taken while purging lines?

- No smoking or open flames

- Vents should be grounded to prevent static electricity

- Keep fire extinguisher close by

500

When is the customer responsible for additional refrigerant annually under the Service Guard Comfort Plan?

After 2lbs 



500

How many colors are listed in the APWA UNIFORM COLOR CODE?

8 Colors