What does (MAOS) stand for?

Minimum Airfield Operating Surface

100

When using the debris backfill method, the crater is filled to within ___ inches of the surface.

18

100

How many gallons of water is used per super sack?

70 gallons

100

What are the dimensions of the SSS?

32'6" L x 20 W x 12' H

100

What is the first step for constructing a soil cement road?

Remove the top soil


200

Who coordinates with different squadrons to get RADR assets (i.e) transportation/ fuel?

RADR OIC

200

What backfill method is used when no suitable debris is available?

 Choke Ballast Backfill Method

200

Capping begins once the wet placed backfill achieves an initial set time of ____ minutes.

30 minutes

200

The SSS is designed to provide for an extended erection of ___ years.

10

200

A ____ lagoon is a flat bottom pond enclosed by an earthen dike?

Oxidation

300

Effective _____ is critical to recovering an airfield as efficiently as possible.

Command and Control (C2)

300

The crater profile measurement ensures the RQC does not exceed a maximum of _____ inches. 

.75

300

The rapid set concrete cap has an initial set time of 45 minutes, and is fully operational in __ amount of time.

2 Hours

300

The recommended site locations should be at least how big?

35' x 50'

300

What type of lagoon is only used as a last resort?

Evaporation

400

The ____ notifies the RADR OIC when crater team crews have completed their primary tasks. 

Crater Chief

400

What piece of equipment is not able to be used to remove upheaved pavement on an asphalt runway?

Dozer

400

How many lbs of material can be placed in the asphalt recycler tumbler?

4400 lbs

400

The guy ropes are used for wind conditions over ____ MPH?

40

400

When constructing a soil cement road, what type of roller do we use once optimum moisture content is reached?

Sheepsfoot Roller

500

What does EALS stand for?

Emergency Airfield Lighting System.

500

What size of lifts should be used when placing the crushed stone cap? 

6 inches

500

Pavements and Construction Equipment (3E2X1) and ____ personnel receive asphalt recycler training at home station. 

Electrical Power Production (3E0X1)

500

What T.O. should you reference when setting up the SSS?

T.O. 35E5-6-11

500

Multiple pond lagoons can be operated in a straight line or a ______ flow patter?

Side by side