Online platform to monitor project progress and record data
Abbreviation for variable frequency drive which accurately controls the speed of standard AC induction or synchronous motors.
What does 'VFD' stand for?
A single point of contact for facility occupants & tenants.
(Ex Internal & external client relationship management, budgeting/accounting (R&M, Corrective Spend), Property Inspections, Vendor Management, Lease Administration, WO Management, Engineering/PjM/Transactions Integration, ESS support, BCP/BDRP Oversight, Partnership with Enterprise Services)
What are FM’s Role & Responsibility?
expanded to include the NPI Tagging procedures, forms and tools. The most recent version of the NPI Checklist is located on this SharePoint site and must be used for all projects in scope for NPI Tagging going forward.
NPI- Non Public Information
What is the Decommission and NPI SharePoint Site?
Provides power to BAC critical loads via batteries in the event of a utility outage.
What is the function of a UPS system?
Emergency (4 hours), Rush (8 business hours) , Normal (5 business days)
What are the three main work order service response levels & the SLA response times?
BofA-owned building control system for over 2,900 financial
A clause within a lease which allows for future rental terms beyond the original lease
What is a Renewal Option?
Location to find information about Project Baseline dates, TF, Mam, COE, Permit & Construction.
What is the new BI Tool/Dashboard?
This is measured in Lumens
What is light output?
An inspection an FM must complete at each property or ATM location assigned to them. All inspections must be completed within a 10-14 month variance from the previous inspection.
What is an FCI & how often are they completed?
Xeriscaping contributes to the BAC 2020 goals by reducing usage of this
What is water or irrigation?
All T1-T4 Transactions and any Acquisition require this approval.
What types of transaction require Governance Approval?
can help you become a leader at all stages of your career. Whether you are an individual contributor, manage an Account, run a Market or lead a small team, you are a leader at JLL.
What is JLL's new leadership development program - Real Leadership?
It is a push button on the wall next to the exit of a space or on equipment. Typically it shuts off power in a raised floor environment in the event of a fire. Sometimes referred to as "EPO"
What is the abbreviation for "Emergency Power Off" ?
Five possible ratings of this report include Negligible, Minor, Significant, Serious, Catastrophic
What are the 5 ratings of a Client Incident Report?
A decrease in building energy consumption directly impacts the reduction this type of
What is greenhouse gas?
Greater than or equal to 90% TK
What’s the headcount percentage required for a Merrill Lynch Legal Entity?
DAILY DOUBLE-
These days, government secrets tend to be leaked digitally with the help of the Internet and weak firewalls. Not so in Australia, where a leak can happen with the simple sale of a secondhand cabinet.
Thousands of pages of Australian government documents, many of them top secret, were locked in two file cabinets that somehow ended up at a used furniture shop in the country’s capital city Canberra, according to the Australian Broadcasting Corporation.
The shop, which isn’t identified, often sells off furniture formerly used by the government. But that furniture isn’t usually packed with nearly a decade’s worth of documents from five government administrations.
This would have been avoided with this process.
It is a dry fire protection system used in data/IT space. This type of system is used to prevent leaks over IT equipment.
The system works in two steps:
1. Detection of heat or smoke which fills the pipes of the sprinkler system effectively creating a wet system.
2. Individual sprinkler heads release to let water flow onto the fire.
What is a “pre-action” system?
The three systems are MyFacility (work order based), BTap (E1 – Spend/one off invoices), OVLA (Landlord)
What are the 3 systems an FM uses to approve invoices?
The sustainability form required to be completed for every GC-managed PDS project
What is the C&D Waste Form?
A mutually executed document between LL and Tenant establishing Tenant’s rights should LL declare bankruptcy or be foreclosed upon.
What is an SNDA?