Nuts About Bolts
Steeling the Show
Measure Twice
Under Pressure
That’ll Cost You
100

Every connection bolt gets exactly this many nuts

What is one?

100

This award celebrates the team’s colour, costumes, cheer, and overall identity.

What is theme?

100

Judges check bridge dimensions before loading, with this removable roadway material absent.

What is decking?

100

This award goes to the bridge with the lowest aggregate deflection.

What is stiffness?

100

One dropped bolt touches the river once during timed construction. This time penalty applies.

What is 15 seconds?

200

Parts of an individual member are joined using this fabrication process.

What is welding?

200

The live oral presentation has this target duration, before the separate judges’ question period.

What is 5 minutes?

200

These designated ground areas are where the bridge’s supports belong.

What are footings?

200

This horizontal force is applied during the lateral load test.

What is 50 pounds?

200

A builder steps into the river while building, rather than retrieving a dropped object. This penalty applies for each occurrence.

What is 2 minutes?

300

Measured from beneath the head to the end, a loose bolt cannot exceed this length.

What is 3 inches?

300

In 2027, construction speed combines total construction time with this other total time.

What is total deconstruction time?

300

Above the river and riverbank, the bridge must provide at least this much vertical clearance.

What is 1 foot?

300

To pass the lateral load test, sway must not exceed this amount.

What is ¾ inch?

300

Each connection identified for repair after construction adds this much to total construction time.

What is 1 minute?

400

This term describes a member’s surface that touches another member at a connection.

What is a faying surface?

400

This category rewards the lowest calculated deconstruction cost.

What is circular engineering?

400

Judges slide this device along the stringers to check their alignment and clearance.

What is the stringer template?

400

During vertical testing, loading stops if any measured downward deflection exceeds this amount.

What is 3 inches?

400

A team stages its bridge for construction but misses its scheduled aesthetics judging. This amount is added to its overall performance rating.

What is $1,000,000?

500

To fully engage a nut, the bolt’s terminal threads must reach at least this far.

What is flush with the nut’s outer face?

500

This category accounts for half of the final scoring.

What is overall performance?

500

A usability dimension exceeds its permitted limit by ½ inch. This much weight is added as a penalty.  

What is 100 pounds?

500

D1 measures −0.24 inches and D2 measures +0.18 inches. This is the aggregate deflection. Hint: Math

What is 0.42 inches?

500

Construction takes 31 minutes. Before other applicable penalties, the spreadsheet records this construction time.

What is 180 minutes?