Choice of the site - what to consider:
Preparing the building site, construction drawing:
People
Building operations
Explain the word.
100

... conditions as strong winds or frequent rain showers

weather

100

The person who is responsible for the building site.

a site manager/a site agent

100

The person responsible for the technical design.

a civil engineer

100

The "base" of the house which is made with the help of concrete.

foundations

100

A plumber.

It is a person who installs water systems.

200

access to water or ... mains and electricity cables

gas

200

Name at least two types of stores which may be placed at storage places.

tool, brick, timber

200

People as joiners, carpenters or electricians are called ...

tradesmen

200

The roof, window and door frames are made by .....

carpenters

200

An apprentice.

It is a person who hasnĀ“t completed his/her training yet.

300

access to ... facilities as kindergartens or schools

education

300

People at the building site must follow ... rules and wear ... clothing and equipment.

safety + protective

300

People who do unskilled works are called ...

labourers

300

It must be built to help bricklayers to erect walls, especially to higher levels.

scaffolding

300

A chisel.

It is a tool which you use for cutting bricks, together with a hammer.

400

the level of ... so as the place is not too wet

groundwater

400

People at the building site should be especially aware of ... electricity, ... materials (easy to catch fire) and ... flames (open fire).

high voltage, highly flammable, naked

400

The person who prepares the approximate cost of the whole construction (and also makes periodic calculations of the completed work) is called ...

a quantity surveyor

400

If the building is situated on a sloping ground, some ... must be done to level it.

grading

400

A tinsmith.

It is a person who fixes the gutters at the end of the roof.

500

the type of ..., e.g. gravel or sand

subsoil

500

The four different views of a building the architect draws are ...

a cross section, longitudinal section, floor plan, elevation

500

Name these tradesmen - at least three of them: 

1. D ..... B .....   2. C .... W ....   3. D ..... P .....      4. F ..... L .....


drywall builder, concrete worker, decorative plasterer, floor layer

500

Name at least five building operations to be done after carcassing is finished.

Walls are plastered and whitewashed, the electric light circuit and central heating are fixed, wooden work as thresholds or staircases are put in place, gutters are fixed, water systems are installed, floors are covered with parquets or tiles, woodwork is painted, walls are decorated or tiled, glass is put in the windows.

500

Temporary services.

They are services that are removed when the permanent work is completed. The typical ones are access roads, site huts and storage places.