Application and Project Approval
MSIS
Procurement
Construction
Closeout
100

Applicants are notified that applications may be submitted by what form of communication.

what is Call for applications?

100

The first status report for a design project cannot be processed because this is missing.

What is Consultant Contract?

100

When a UR does not have sufficient funds for a project, HQ will not provide?

What is Approval to Award?

100

This amount of payment is held with each progress payment by the UR.

What is Mechanics Lien Holdback?

100

This review by the consultant is typically planned at 10 months post project completion to ensure the work remains free of defects

What is Warranty Inspection?

200

The applicant is required to submit specifics detailing how they will finance a project.

What is Financial Evaluation?

200

The “As -builts approved date” is found where in MSIS

What is Project Close out Tab?

200

When a letter of approval to tender is issued, the Project Rep updates what?

What is Project Tracker?

200

This funding component is used to address unforeseen circumstances that may arise during construction, and is returned to MI upon project completion

What is Contingency?

200

Upon issuance of this document, the warranty period is initiated.

What is Substantial Performance?

300

When considering applications, MI HQ staff will disqualify projects when they are non-compliant with what? 

What is Long term BWA?

300

Prior to sending an approval to award letter for Director signature, this needs to be updated in MSIS.

What is Scheduling Tab?

300

These documents are required to be in place prior to advertisement of any construction tender.

What is Permits?

300

This submission protects the funding recipient from liability for unpaid WorkplaceNL assessments owed by the contractor.

What is WorkplaceNL Clearance Letter?

300

Consultant or designer is responsible for these documents after construction is complete.

What is As-Builts?

400

When submitting an application, the applicant should consult what process to prioritize projects?

What is Asset Management?

400

This drop down list is utilized throughout a project, and the PR is responsible for keeping it accurate.

What is Process Status?

400

Who may, within the published scope of an open or limited call for bids or a negotiated contract, authorize a change order on a project?

Who is Head of the Public Body?

400

This WRMD permit provides the authorization to alter a body of water, and requires a minimum of 45-60 days for review.

What is Section 48 permit?

400

The final phase of a project includes document is completed at the end of a project and handed over to the owner. 

What is Commissioning?

500

This type of mechanical equipment receives HSE score based on age.

What is a Lift Station?

500

Critical information, beyond simple scoring information, that should be relayed from the Regional Office to the Director concerning application suitability is noted here in the engineering tab? 

What is Project Review Remarks?

500

This procurement method is used to invite submissions when the requirement is of a complex or unique nature.

What is RFP?

500

In the funding agreement, the Recipient is required to do a number of things. What is required to obtain the first payment that included construction?

What is Install a project sign?

500

A contractor fails to complete the deficiencies at the end of the project. This process protects the owner.

What is performance Bond?