Show:
Questions
Responses
Print
T.O's
Storage System
Distribution System
Refuel/Defuel
1-1-3
100
You go into this T.O to preform open tank maintenance.
What is what is the 1C-130J-2-28JG-00-1
100
These barriers make up the FWD and AFT portion of the Main Tanks .
What is the FWD and AFT spar
100
The boost pump inlet screens are checked for polyurethane during this inspection.
The 540 day inspection.
100
The surge suppressor be serviced to this before performing a refuel.
What is 40 (+/-)5 PSI?
100
This is used for classifying fuel leaks.
What is Table 4-1?
200
You go into this T.O to get in-tank Quantity readings.
What is the 1C-130J-2-28FI-00-1
200
What are the Auxiliary and Inboard main tanks.
Which tank(s) contain the wrap-around vent system?
200
It takes approximately this long for the SPR drain pump to shut off.
What is 2.5 minutes?
200
While defueling, these are the fuel levels the main tank transfer pumps should be shut off.
What is 3,000lbs for outboard, 1,500lbs for inboard?
200
This PPE shall be worn when accomplishing curing-type sealant repair.
What are Chemical resistant gloves, static-resistant head covering, chemical resistant goggles?
300
This is the maximum amount of days between updates.
What is seven days?
300
This item allows fuel to transfer from one section to the other in the outbd tanks
What is the percolator?
300
This keeps the boost pump submerged in fuel.
What is the surge box?
300
Boost pumps should be ran this long after refueling in order to prevent venting.
What is at least 5 minutes?
300
The MEP is routed through these organizations for approval.
Who are the MXG/CC (or equivalent), Safety, BEF, and Fire Protection Services.
400
This T.O and chapter has the classification for fuel leaks
What is the 1-1-3 and chapter 4
400
1,222 U.S. Gallons are usable from these tanks
What are the outboard main tanks.
400
A non-Teflon boost pump discharge line should be changed this often.
What is every 10 years?
400
This is the amount of parts the FMC conducts while performing a FLCV test.
What is seven?
400
These are the two basic types of integral fuel tank access doors.
What are the plug and direct seals?
500
The figure that allows an additional 2.0 PF for the maximum reading to account for test equipment
What is Figure 5-2
500
You should wait this long for the system to stabilize during an operational checkout of the vent system
What is five minutes?
500
This is the bonding resistance value for a fuel pump after installation.
What is 0.00037 Ohms.
500
The chocks should be in this position while refueling.
What is front and back of each aft main gear tire, maintaining at least a 2-inch gap between the tire and the chock?
500
Shelf life may be extended IAW this.
What is AFMAN 23-110 and the SLED?