Buildind Const
SOP1
Fire Officer
ISO
SOP2
100

Type 3 building construction

Ordinary construction

100

To provide a 320 gpm interior attack line

What is the Purpose of the HVAP?

100

5 steps of risk management in order

1-Identify Hazards

2-Evaluate Hazards

3-Prioritize Hazards

4-Control Hazards

5-Monitor Hazards

100

An intervention to make crews, command staff, and general staff aware that a hazard or injury potential exists.

Soft Intervention

100

How many victims for a Mass Casualty Incident?

10 or more.

200

3 ways a load is applied to a structural member

Compression

Tension

Shear

200

 An intact structure is required

-Interior Carbon Monoxide levels may be increased

-Hidden fires may be extended

The Disadvantages of a PPV are?

200

Levels of Command

Strategic, Tactical, Task

200

Smoke leaving a structure has four key attributes.

Volume, velocity (pressure), density and color,

200

What color and length tethers are in the LAST bag

1-Orange 48"

2- Blue 20"

300

a beam which is supported only at one end

Cantilever Beam

300

 % of class A foam can be used as a last resort on small flammable liquid fires

What is 1%

300
3 Leadership Styles

Autocratic

Democratic

laissez-faire

300

When an electrical wire is on the ground, current flows in all directions from the point of contact. Voltage drops as the current flows away from that point.

Ground Gradient

300

ICS 214

Unit Activity Log

400

a beam especially provided over an opening for a door or window to carry the wall over opening. aka Header

Lintel beam

400

Where are the alternate elevator recall floors, & when are they used?

2 floors above the main recall floor. Used when smoke detectors are activated in the lobby.

400

pessimistic view of employees - they don't like work, need to be watched, and need rewards and punishment to keep them in line.

McGregor Theory X

400

The 4 R's of rehab

Rest, rehydration, Rx(medical), refueling

400

Who is responsible for implementing Mass causality procedures and ICS

First arriving Company Officer

500

the building or part of it is no longer performing its function, ie. communication of fire through a fire rate barrier.

building failure

500

REM limits

-not greater than accumulated dose of 10 Rem or single dose greater than 5 Rem.

-Life saving activities accumulated dose not greater that 25 Rem or single dose of greater than 12.5 Rem

500

Maslow’s Hierarchy of Needs

Level 1: Physiological Needs 

Level 2: Safety, Security and Order 

Level 3: Social Needs & Affection 

Level 4: Esteem & Status 

Level 5: Self-actualization

500

1-Classifying building construction

2-Determining Structural Involvement

3-Visualize & Trace loads

4-Evalaute time

5-Predict & communicate collapse potential

5 Steps of predicting Building Collapse

500

In the event of an MCI, the Omaha Trauma Centers will both open and receive?

Code 3 (RED) patients with a 4 and 4 rotation.