Bid Components (Chart)
Proposal
Contract Docs
Misc
Specifications
100

What is bid price connected to?

Markup

100

Bid Bonds are usually calculated as a
________of the construction cost.

Percentage


100

What are the 3 Principle objectives of a project?

The principle project objectives are to
build a project within budget, on time,
and according to the quality specified

100

shop drawings are usually prepared by the _____

fabricator or supplier

100

Specifications address materials,
workmanship, and operation or ______ 

performance characteristics

200

What is Markup connected to? (first 2)

Indirect and direct costs

200

The Proposal (Bid) Form is an offer and
a ________ to enter into a contract if
selected

Promise
200

What are the 3 basic purposes of a contract document?

basis for competitive bidding
 as contract administration documents
 basis for the settlement of disputes, etc.

200

what are the 2 Drawings that are not part of the bid and
contract documents:

as-built (record) drawings
 shop drawings:

200

which type of agencies have their own format?

Public

300

what is direct job cost connected to?

Labor Materials Equipment Subcontracts

300

______ Provide verbal descriptions of technical
requirements 

technical specs


300

What are the two types of drawings in the bid and contract?

Project Specific and Standard

300

In commercial work, the most commonly used
specification format are the ones published
by the ______________ or ___________

Construction Specifications Institute
(CSI) or Masterspec

300

____________ Specifications are also called end-result specs

Performance

400

what is indirect job cost related to?

Overhead Support
Structures
Purchase
Orders

400

The proposal/bid form must include:(5)

the promise
 list of addenda
 base cost and alternatives
 accompanied by surety deposit or bid bond
 signatures and seal

400

contract drawings for a building consist of the
following 5 things

site layout and grading
 architectural and arrangement
 structural
 mechanical and plumbing
 electrical

400

3 types or risks

Quantity takeoff, Detail sheets, Markup
400

______ is suited for situations where end results
cannot be easily verified. _______ is Best suited where desired results can be
verified by observation, tests,
measurements, etc. 

Design Specs, Performance Specs

500

Draw the entire Graph on the board. -50pts for every wrong block

LOL

500

Proposal details include (theres 6, name 4)

etailed Costs
 Item by item
 Total Bid
Bidders Statement of Understanding
 Sufficient time to examine work
 Understanding of General Conditions,  
Supplemental Conditions, and Addendums
Bid Bond  - Proposal Guaranty







Prequalification Certificate (if
appropriate)
List of Subcontractors (if requested)
Certifications

Detailed Costs
Bidders Statement of Understanding
Bid Bond  -

500

Name all 8 Contract documents

Form of Agreement – executed contract
 General Conditions
 Special (Supplemental) Conditions
 Drawings
 Specifications
 Bonds (performance, payment) – guarantees to
performance and subcontractor payment
 Addendum
 Change Orders – official changes to the constr.
contract for cost and/or time

500

Name the 8 bid docs


 Instructions to Bidders – info on bidding process
 Proposal (Bid) Form – form used  to submit bid
 Form of Agreement – sample contract
 General Conditions – constr. contract procedures
 Special (Supplemental) Conditions  - requirements
pertaining to actual project
 Drawings – diagrammatic project layout
 Specifications – materials, testing, workmanship
 Addendum – official changes to the bid documents

500

Examples of agencies and
organizations include: (2)

federal government--standard military
specifications
 technical societies--ASTM, AASHTO,
ANSI, etc.