Architecture and Construction1
Careers1
Careers2
Architecture and Construction2
Architecture and Construction3
100

Which of the following is NOT a career within the Construction pathway? 

A:Bricklayer

B:Inspector

C:Plumber

D:Surveyor

D:Surveyor

100

a person who makes and repairs wooden objects and structures.

A: Carpenter

B: Painter

C: Building Inspector

D: Plumber

Carpenter 

100

a person who welds metal.

A: contractor

B: Welder

C: Architect

D:Landscape Architect

Welder

100

Select all of the following perishable materials in which were used to build the first buildings. 

Animal hides

Branches

Leaves

Steel

Animal hides

Branches

Leaves

100

True or False: 

The first buildings were made by hand or with simple tools. 

True

200

Which of the following is considered a challenge of working in the Design and Pre-Construction pathway?

A: Physical demands

B: Gaining new skills

C:Keeping up to date technology

D: Tight deadlines

D: Tight Deadlines

200
a person who installs and repairs the pipes and fittings of water supply, sanitation, or heating systems.


A: Carpenter 

B: Plumber

C: Brick Mason

D: Building Inspector



Plumber

200
a person who installs and maintains electrical equipment.


A: surveyor

B: Architect

C: Electrician

D: Landscape architect

Electrician

200

Most training periods for architects last _____ years.

A: Three

B: Eight

A: Three

200

Which of the following is a career within the maintenance and operations pathway? 

A: painters

B: precision layout workers

C: cost estimators

D: graphic designers

A: painters

300

Bachelor's Degree programs in architecture introduce which of the following? 

A: sustainable building practices

B: historic preservation

C: fundamental design concepts

D: urban planning

C: fundamental design concepts

300

a person who paints buildings, walls, ceilings, and woodwork, especially as a job.

A: Drywall Installer

B: Construction Manager

C: Painter

D: Plumber

Painter

300

a person who is qualified to design buildings and to plan and supervise their construction.

A:Architect

B:Heating Ventilation and Air Conditioning Mechanic

C:Welder

D:Contractor

Architect

300

Which of the following is a task involved in the design and pre construction pathway? 

A: renovating structures

B: determining the layout of the land

C: ensuring structures meet government codes

D: planning preventative maintenance

B: Determining the layout of the land

300

An architect must pass which of the following to become certified?

A: architect internship exam

B: AQ test

C: architecture praacticing exam

D: architect registration exam

D: architect registration exam

400

Which of the following is a position within the design and pre-construction pathway?

A: architects

B: plumber

C: electrician

D:groundskeeper

A:Architect

400

a construction worker who builds and repairs structures using brick, concrete block, and other masonry materials

A: Building Inspector

B: Construction Manager

C: Carpenter

D: Brick Mason/Bricklayer

Brick Mason/Bricklayer

400

assemble, set up, and maintain rooftop or other systems that convert sunlight into energy.

A:Solar energy system installer

B: Surveyor

C: welder

D: Contractor

Solar Energy System Installer

400

Specifications focus on which of the following? 

A: removing harmful materials from the workplace

B: electrical layout

C: materials, installation techniques and quality standards

D: calculations

C: materials, installation techniques and quality standards

400

Which of the following is considered a challenge of working in the design and pre-construction pathway?

A: physical demands

B: gaining new skills

C: keeping up to date technology

D: tight deadlines

D: tight deadlines

500

Which of the following is the difference between the construction pathway and the maintenance and operations pathway?

A:construction professionals work on designs

B: construction professionals work outdoors only

C: maintenance and operations professionals work on structures which have already been completed.

D: maintenance and operations professionals need no formal education

C: maintenance and operations professionals work on structures which have already been completed.

500

a leader who plans, coordinates, and oversees construction projects.

A: Carpenter

B: Plumber

C:Construction Manager

D:Drywall Installer

Construction Manager

500

a construction worker who cuts, measures, and installs drywall panels on walls and ceilings.

A:Drywall Installer/Sheetrock Applicator

B:Plumber

C:Construction Manager

D:Painter

Drywall Installer/Sheetrock Applicator

500

Which of the following is NOt a trend used in architecture and construction?

A: 3D printing

B: occupancy sensors

C: Green construction software

D: unsustainable materials

D: unsustainable materials

500

Who designed the Parthenon?

A: Iktinos

B: Egyptians

C: Nomads

D: Apian

A: Iktinos