Which of the following is NOT a career within the Construction pathway?
A:Bricklayer
B:Inspector
C:Plumber
D:Surveyor
D:Surveyor
a person who makes and repairs wooden objects and structures.
A: Carpenter
B: Painter
C: Building Inspector
D: Plumber
Carpenter
a person who welds metal.
A: contractor
B: Welder
C: Architect
D:Landscape Architect
Welder
Select all of the following perishable materials in which were used to build the first buildings.
Animal hides
Branches
Leaves
Steel
Animal hides
Branches
Leaves
True or False:
The first buildings were made by hand or with simple tools.
True
Which of the following is considered a challenge of working in the Design and Pre-Construction pathway?
A: Physical demands
B: Gaining new skills
C:Keeping up to date technology
D: Tight deadlines
D: Tight Deadlines
A: Carpenter
B: Plumber
C: Brick Mason
D: Building Inspector
Plumber
A: surveyor
B: Architect
C: Electrician
D: Landscape architect
Electrician
Most training periods for architects last _____ years.
A: Three
B: Eight
A: Three
Which of the following is a career within the maintenance and operations pathway?
A: painters
B: precision layout workers
C: cost estimators
D: graphic designers
A: painters
Bachelor's Degree programs in architecture introduce which of the following?
A: sustainable building practices
B: historic preservation
C: fundamental design concepts
D: urban planning
C: fundamental design concepts
a person who paints buildings, walls, ceilings, and woodwork, especially as a job.
A: Drywall Installer
B: Construction Manager
C: Painter
D: Plumber
Painter
a person who is qualified to design buildings and to plan and supervise their construction.
A:Architect
B:Heating Ventilation and Air Conditioning Mechanic
C:Welder
D:Contractor
Architect
Which of the following is a task involved in the design and pre construction pathway?
A: renovating structures
B: determining the layout of the land
C: ensuring structures meet government codes
D: planning preventative maintenance
B: Determining the layout of the land
An architect must pass which of the following to become certified?
A: architect internship exam
B: AQ test
C: architecture praacticing exam
D: architect registration exam
D: architect registration exam
Which of the following is a position within the design and pre-construction pathway?
A: architects
B: plumber
C: electrician
D:groundskeeper
A:Architect
a construction worker who builds and repairs structures using brick, concrete block, and other masonry materials
A: Building Inspector
B: Construction Manager
C: Carpenter
D: Brick Mason/Bricklayer
Brick Mason/Bricklayer
assemble, set up, and maintain rooftop or other systems that convert sunlight into energy.
A:Solar energy system installer
B: Surveyor
C: welder
D: Contractor
Solar Energy System Installer
Specifications focus on which of the following?
A: removing harmful materials from the workplace
B: electrical layout
C: materials, installation techniques and quality standards
D: calculations
C: materials, installation techniques and quality standards
Which of the following is considered a challenge of working in the design and pre-construction pathway?
A: physical demands
B: gaining new skills
C: keeping up to date technology
D: tight deadlines
D: tight deadlines
Which of the following is the difference between the construction pathway and the maintenance and operations pathway?
A:construction professionals work on designs
B: construction professionals work outdoors only
C: maintenance and operations professionals work on structures which have already been completed.
D: maintenance and operations professionals need no formal education
C: maintenance and operations professionals work on structures which have already been completed.
a leader who plans, coordinates, and oversees construction projects.
A: Carpenter
B: Plumber
C:Construction Manager
D:Drywall Installer
Construction Manager
a construction worker who cuts, measures, and installs drywall panels on walls and ceilings.
A:Drywall Installer/Sheetrock Applicator
B:Plumber
C:Construction Manager
D:Painter
Drywall Installer/Sheetrock Applicator
Which of the following is NOt a trend used in architecture and construction?
A: 3D printing
B: occupancy sensors
C: Green construction software
D: unsustainable materials
D: unsustainable materials
Who designed the Parthenon?
A: Iktinos
B: Egyptians
C: Nomads
D: Apian
A: Iktinos