Mechanical Events
Risk
Escalations/Standards
OSP
Miscellaneous
100

AFE is currently running OOS incompletes. WIP levels are currently within buffer but you had previously had WIP above max buffer. What is more likely the cause?

Totes are downstacked at JP

100

At what percent deviation do we need to update Lagrange capacities?

5%

100

What percentage must an Autoflow detected rate deviate from PPA actual rate in order to apply an OR

+/- 20%

100

True or False: AF consumes rates from OSP

False, AF consumes HCs from OSP, NOT rates

100

What else, besides high WIP, can pick throttle be engaged for?

Scanned in excess of 12k

200

Site calls out "AFE2 tray sorter down" What 2 things should you ask the site for?

TT and ETA
200

What two "families" can TRB be triggered for?

Multis, Singles

200

What is the standard for addressing risk with your sites? (Pick/Pack %)

Pick 100% / Pack 80%

200

Where do we find ship dock rates for PDP planning?

Central Ship Dock Standard Rates Page

200

How long does it take for Autoflow to detect drift (in minutes)?

30-45 minutes (2-3 cycles)

300

Site calls out SLAM line down/jammed. What Workpool ("bucket") in RODEO would you likely see elevated as a result?

Scanned

300

TRB will trigger based on what system?

CORA

300

When is it required to escalate elevated problem solve, and to whom do we escalate?

1k total problem solve; Team Lead

300

True or False: If generating a plan with ELD off, you should only disable ELD for the current shift

False: ELD must be either enabled or disabled for the entire planning horizon

300

Site takes a 30 minute break that begins at 09:30. What is the first full pure hour following the break? 

10:15-11:15. break ends at 10:00, first 15 min of next interval are trash data since site is still staffing.

400

Your Shipping Sorter goes down, what paths are mainly impacted?

AFEs/Mix

400

What is TRB

An automated software that prevents most promise from assigning to specific CPTs based on current due out work

400

WHat is the units missed threshold at which a COE is required?

500 misses for an interval, or 500 misses for a singles CPT for AR sites (200 units per interval if you're running batchy/TSSL)


400

The Definition of "Expected Misses" in OSP

What Is the total number of misses based on picks that will not make it to pack by slam pad time

400

What does Euler do?

Prioritizes Pick assignments based on available capacity, cost, and transportation space

500

AFE1 is hard down due to a mechanical event with an eta of 3 hours to repair. Besides a WI to adjust hcs and pause AFE1, what other action should be taken in AF?

Disable hardware for AFE1 (confirm with TL before doing this)

500

Where do Lagrange inputs come from within the OSP planning horizon?

OSP and Autoflow

500

You are planning your PDP and the site calls out that they have 25 Day 2 NHs and 15 NHs in week 2. At what HC and rate % would we plan the NHs?

25 NHs at 60%

500

When does the PDP become available to plan in OSP?

20 hours prior to start of that shift

500

What does CCC do?

Balances the Backlog between certain paths, aligning the ratio of pre-picked shipments