What Risk percentage threshold would you need to surpass to send 30 minute risk emails?
What is >70%?
The target buffer (Min or Max buffer depending on WIP) assuming PPMix has a target min and max buffer of 45 - 60 units per packer, 10 packers, and WIP is HIGH?
What is 600?
The grace period when clocking in at SOS.
What is 5 minutes?
The frequency with which Autoflow updates intervals.
What is every 15 minutes?
The names and abbreviations of the shifts at Central Flow (and most Amazon FCs).
What is FHD, FHN, BHD, and BHN.
What are the process families that TRB can be triggered for?
What is Singles and or Multis.
What percentage deviation in Lagrange requires an override?
What is 5%?
Frequency of risk emails under varying conditions.
What is every 30 minutes for >70% and every hour for <70%.
The thresholds that rates must be different by in order to place a rate override into Autoflow.
What is 20% for all pack/pick/induct paths?
The time zone all Central Flow computers should be in, at all times, regardless of Arizona's time.
What is Pacific Time?
What web tool is used to assess TRB engagement based upon either the Singles or Multis Family rather than overall outbound capacity?
What is CORA.
Frequency that a flow lead should be updating Autoflow rate overrides.
What is every 15 minutes?
To whom do you escalate to if scanned WIP reached or exceeds 5K units?
What is TL/Area Manager and Site Ops?
What are used to verify ShipDock rates when planning in OSP?
What is Central Dock Wiki Link/ B3O4 tool
The difference between Pacific time and Eastern time in the Summer.
What is 3 hours, regardless of time of year.
If the site has an actual pack capacity of 20,100 units per hour, and they are picking at 26,000 UPH and their Transshipment is planned at 10,000 units, how much transship would we expect to actually pick?
What is 5900 units per hour?
What is the current standard work for New Hire planning in OSP?
What is POVR rate planning for Week 1 only?
The two conditions under which a flow lead must put in a COE.
What is a CE and Trans misses over current threshold.
OSP Plans can be generated with ELD off with site senior approval.
What is False?
PPMix backlog percentage assuming:
AFE1 - 40k
AFE2 - 35k
PPMix - 13k
SM - 4k
SP - 8k
What is 13%
You've given the Site a total pick ask of 38,000, with Trans Volume planned at 5,500. The Site escalates that their Trans line has gone down with an ETA of 2 hours until repaired. What is the updated pick ask?
What is 32,500 pick ask.
The site's ship sorter has gone down with no eta, which paths require pausing?
What is AFE/Pick2Rebin/PPMix.
Your site's WIP has exceeded the max buffer by 10% for roughly 15 - 30 minutes. What steps should you take?
What is "Provide pick throttle warning and escalate to site senior and CF AM".
The webtool to validate Autoflow rates.
What is PPA?
The name and abbreviation for the system that moves work between AFE1/AFE2 as it charges in, and moves work between SS/SP as it charges in.
What is Cost and Capacity based Categorization, CCC.