Entergy People
Framing
OH
DACT
Texas
100

With the new organizational changes in the OCE, who is the VP that our group reports up to?

Bill Sones

100

What are the tangent poles?

P2

P3

P4

100

What neutral position shall all new primary line construction be?

Unshielded

The rule of thumb with 4 consecutive poles is also no longer valid as the overall line design is more important than individual pole details.


100

What does DACT stand for?

Damage Assessment Collection Tool

100

Who was the first elected president of the Republic of Texas?

Sam Houston

200

Who is the Sr. Manager of Region Operations for the Central Region?

Mark Enloe

200

What is the primary framing number on P2?

4 - DE 

200

Critical poles are to be ran at what poleforeman construction grade?

Grade B

A Critical Pole supports equipment that is vital to restoration, complex to restore, or support high value Entergy line equipment.  Critical structures include feeder getaway structures and those structures that support equipment on a single pole: reclosers, regulators, capacitor banks, DVAR units, and major crossings.

200

What are the two different roles/applications in DACT?

Assigner & Assessor

200

What Texas city is nicknamed “Cowtown”?

Fort Worth

300

Who are the OC's for the Central Region Operational Networks?

Cleveland - Eric Martin

Dayton - Aaron Garess

New Caney - Pierre Shannon

Bragging Points - Winnie - Aaron Garess

300

What pole has large angle framing (3)?

P4

300

The standard location for guying is approximately __ to __ inches below the load.

8 to 12

300

When searching for assigned tickets in Field Maps, what do you need to put after your Entergy user name?

_entergy

300

What is the second largest city in Texas?

San Antonio

400

Who is the Sr. Manager of Engineering for Texas?

Tony Reed

400

What pole has DE to slack framing (5)?

P1 & P5

400

What is the spacing between phases/neutral on vertical construction?

60"

400

When using DACT with out cell service what are some best practices to ensure best use?

Only need 1 answer

Always work in offline maps when assessing damages (Blue Sky or Gray Sky)

Add Offline Area (download) before leaving internet connectivity

Manually sync map when internet connectivity is available, or set up manual sync

Updating Offline Maps

400

What is the name of Texas's highest peak?

Guadalupe Peak, standing at 8,751 feet

500

Who is the Entergy Texas President & CEO?

Eli Viamontes

500

List the framing style numbers for this job?

P1 - 4 DE

P2 - 5 DE to Slack

P3 - 4 DE

500

Max Span Lengths for these primary wires

A10

A336/A447

A795

A10 - 300

A336/A477 - 250

A795 - 200

500

Automatic data syncs are attempted by DACT how oftern?

15 minutes

500

In what year did Texas declare it's independence?

1836