New Store Prototype
Reinvestment Prototype
Change Management
Comments
Redlines
100

This specific building type with a corner drive-thru was discontinued

What is the LC building?

100

This template building has the smallest square footage of side dining repurposed for kitchen.

What are narrow buildings?

100

These come out weekly but are not typically an action item.

What are Notifications?

100

This is filled out towards the beginning of projects and sometimes asks for shelving calculations, refrigeration capacity, and process questions. 

What is a health application? 

100

We dimension to these to a structural point, both horizontally and vertically in elevation. 

 What are rough-ins?

200

What is the name of the last Series of the New Store template that was in AutoCAD?

What is S08H?

200
This area is intended to be dedicated to its purpose and this area compared to the NS templates is relatively small.

What is the Team Member area?

200

This has been in change management with CFA, and just got recently approved to be in the next New Store prototype.

What is CL 4.0?

200

A request for additional hand sinks are typically this. 

What is health comments? 

200

This should be on the left side of the Drive-Thru door, even in a reverse store.

What is the j-box for door power?

300

This piece of equipment was previously in the Trimark models but now lives within the mechanical models.

What are hoods?

300

This space is "missing" from the Reinvestment templates; however, new store accommodates this.

What is the DTT closet?
300

This helps differentiate the intentions of when to implement and the level of importance when the document is released

What are DesigNote Categories?

300

Examples of this are: a request later in the project's life to reuse existing library-style shelving, allow for extra iPad electrical, or add extra lockers. 

What are operator comments?

300

We lower this when a shelf is below a window, but otherwise, the typical height is 8'. 

What is blocking?

400

These items should be dimensioned in plans, but it is not millwork, a baby changer, walk-ins, or a shelf.

What is ACF stainless fabrication in the Drive-Thru?

400

This item is often needed in the BOH, but not spaced and planned into the Reinvestment templates. It often required trash equipment and team member space to be reconfigured.

What is the fire riser?

400

This piece of equipment has a larger holding capacity than the current template model, and will be included in the next New Store template release.

What is the 8-pan hot hold unit?

400

We see these when sheets are not well coordinated, typically during the time the store is in construction. 

What is an RFI? 

400

We only show this BOH equipment as optional and rely on surveys to know if it's in a store. 

What is trash equipment [or operator choice equipment]?