Control of Modifications
Who will be always the pilot if the change is during the project?
The Project Manager
Meaning of Abbreviation ECR…
Engineering Change Request
How many Steps has the Life Cycle of an ECR on PDM?
7 Steps
Meaning of Abbreviation ECO…
Engineering Change Order
Meaning of Abbreviation PDM…
Product Data Management
A Modification of a packaging should be managed by CLI02-01-003?
Yes
True or False: If there is no Parts or no CAD Documents impacted by the modification, ECO is not needed?
True
According to MAN02-03-003
True or False:
During Design Phase (before tooling Kick Off) the usage of ECR is not mandatory but possible?
True
New tools should be managed by CLI02-01-003?
Yes
At what step of an ECR the decision is taken?
Step 4
REVIEW of the Impact analysis and risks for decision
Can be cancelled an ECR in CREATE status?
No, it must be at least in Submit.
Who takes the decision of manage the change with QP or action plan?
The decision is taken by the PLM at the status “REVIEW” and record in the ECR before the kickoff.
How many Steps has the Life Cycle of an ECO on PDM?
6 Steps
At what step of an ECR the Actions are defined?
Step 5 Plan ECO: Action plan & Review
The impact analysis is done at what step of the ECR?
STEP 3
STATUS EVALUATE: Evaluate the impacts and risks
True of False:
One ECR can be connected to several ECO?
True - For multiple components, several use cases.
Who appoints the pilot of the change AFTER the project end by a change managed by PL?
The PLM
True or False:
The changes managed with a quality plan are not always followed in project steering committee – CPP.
False - Are always followed in project steering committee – CPP. (see CLI02-01-005)
Who appoints the pilot of the change AFTER the project end by a change managed by Technical Group?
The Technical Manager.
How is decided if the change is managed by Product Line or by Technical group?
By answering the questions in the ECR template
Who is the ECO approve to promote to Released state?
The Project Manager
Which are the mandatory Elements in Action Plan of an ECR?
The action plan must contain at least an industrial production, an audit including the document checking of PSW dossier.
Who approve the Step Review of an ECO?
DE & PE approvals
Who validates and perform the closing review of a PL change AFTER Project end?
PLM /Engineering manager + PQE