Plan the BA Approach
Coduct Stakeholder Analysis
Plan BA activities and Communication
Plan Requirements Management Process
Manage BA Performance
100
These are the common Business Analsyt approaches /methodologies
What is Waterfall, Agile, Lean, Six-sigma
100
any individual or group that is affected by a change or project, or has influence over its outcome
What is Stakeholder
100
Stakeholders are located in a single geographic area
What is collocated
100
a place or method for storing and retrieving information. May be short or long term storage
What is a repository
100
The Two Outputs of the Manage Business Analysis Performance
What is BA Performance Assessment and Organizational Process Assets
200
the 2 basic elements involved in choosing an approach
What is Plan-driven and change- driven
200
Business Need, Enterprise Archicture, Organizational Process Assets
What is inputs to Conduct Stakeholder Analysis
200
A proejct planning technique that hiearachically breaks down deliverables and tasks of a project into manageable pieces
What is a Work Breakdown Structure
200
The ability to track a requirment through the development life cycle
What is traceability
200
A standard of measurement, often associated with a goal or the performance of something
What is a metric
300
The approach the emphasis Formality, Planning and Control emhpasis
What is plan driven
300
to be a complelling force on or produce effects from others. Proactively shift thinking, actions, and even emotional states of other people
What is influence
300
A list of activities needed to produce deliverables on a project
What is an activity list
300
provide useful management information about requiremetns, such as their relative priority, source, status, stability, etc.
What is an attribute
300
the difference between a planned, budgeted or expected result and the actual result
What is a variance
400
An overall process for conducting business analysis on a given project
What is Approach
400
A RACI matrix
What is Responsible, Accountable, Consult With, Inform
400
a Comprehensive requirements document used for presentation to stakeholders. Groups all related requirements documents together
requirements package
400
Decision Analysis, Problem Tracking and Risk Analysis
What is the thee general techniques involved in requirements management planning
400
Performance Measures, Performance Reporting and Preventitive and Corrective Action
What is the elements for Manage BA Performance
500
The main output from the Plan Business Analysis Approach task
What is The Business analysis Approach
500
the main output from conduct stakeholder analysis task
What is stakeholder list, roles and responsibilities
500
The only technique involved in communication planning
What is a structured walkthrough
500
Main output from Requirements Management process
What is Requirements Management Plan
500
A change taken to address a problem indicated through performance or other measures
What is a corrective action