Vocab
Step by step instructions
Alignment
Methods
Program test
100
a code that writes machine coordinates into work registers based on the present tool position
What is axis present code
100
4th step of coordinating PRZ on a turning center
What is start the spindle
100
X-Y Alignment step by step__? load the indicator holder--Manually or MDI
What is step one
100
Program reading, graphic evaluation, and CAM PC graphic evaluation
What is prerun test
100
how many test
What is 13
200
fixture offset G codes
What is G54 through G59
200
1st step in vise alignment and coordination
What is rough align
200
X-Y PRZ coordination- park the spindle over a____?
What is a hole
200
Optional stop, single step cycle, and feed/speed override
What is halt run
200
machine ____ test
What is motion
300
shop lingo for work coordinates
What is work coords
300
edge intersection how many step by steps
What is 2
300
Edge intersection step by step. how many?
What is 2
300
Tryout material, fake offsets, and single step testing
What is test run
300
Test 2, 3, and 4 are for?
What is graphic evaluations
400
allows a small shift in the PRZ to accommodate abnormal work pieces
What is material shift offset
400
one reason radius offsets might be adjusted by the operator and compensated for___? name one
What is tool wear, machine warm up, tool replacement from failure, change a dimension, adjust for delection
400
Fixture offset uses ___ programming methods
What is 3
400
An axis disable, tool or material withheld, oversize offsets
What is dry run
400
test ___ oversize radius offsets
What is 11