Decon
Decon
Perimeters
Zones
IC System
100

Types of Decon are?

Mass, Technical, Gross, Emergency (rapid)

100

Decon happens in the _______

Warm zone

100

Evaluate, assess, form an opinion, what is happening (now), what could happen, progressive

Size Up

100

What are the control zones? Where are they?

Hot, warm, cold. Area immediately surrounding the release, Outside the hot zone, IC.

100

Established when the first unit arrives on scene and is maintained until the last unit leaves. Can be transferred.

Incident Command

200

Deliberate, sequential process of safely removing/neutralizing HazMats, Bio Agents or Radioactive materials from personnel, PPE and tools within reason

Technical Decon

200

Use water, unless

Chemical is water reactive

200

Detailed proposal describing strategies and tactics. Can be an aggressive offensive, defensive or non-intervention position

Action Plan

200

How many threat levels are there?

3

200

Involves representatives from various agencies collaboratively making decisions and coordinating response efforts

Unified Command

300

Rapid, large scale removal of HazMats from large groups of people

Mass Decon

300

As you go through the decon line, what happens to the PPE and tools used?

Bagged and sealed for further cleaning or disposal

300

Requires setting up  safe perimeter and working with outside sources

Gaining Control

300

Buddy System

2 in 2 out, or else

300

When an incident is too large/complex for the Incident Command to manage alone, they will divide responsibilities into operational categories known as

General Staff

400

Rapid, life saving process designed to quickly remove HazMats from a person before they cause server injury or death

Emergency Decon

400

You MUST be mostly deconned before

Receiving medical help

400

DECIDE

Detect, Estimate, Choose, Identify, Do, Evaluate

400

CAN Report

Conditions, Actions, Needs

400

Public Information Officer, Safety Officer, Liaison Officer

Command Staff

500

Initial, rapid process of removing the bulk of hazardous contaminants, such as carcinogens, toxic chemicals or biological agents from people or equipment

Gross Decon

500

What stays on during the entire decon process

SCBA

500

Safety perimeters established during a HazMat incident to separate responders from the danger area, prevent contamination spread and provide a safe operational space

Hazard Control Zones

500

Comprehensive, written document

Site Safety Plan

500

Operations, Planning, Logistic, Finance/ Admin Sections

General Staff