Besides vibration and construction lighting, what is the most common resident concern with night construction?
What is noise?
CIP projects are responsible for the costs of replacing this kind of tree when the project must remove them
What is a viable tree?
Besides recreational users, this group consistently uses the CKC.
What are commuters?
The only controversial feature of the 128th Avenue Northeast greenway was this kind of improvement located at Northeast 100th Street. This type of community member is likely to resist any form of access control.
What is a diverter?
What is the name of the Seahawk mascot that opened the 100th Avenue Northeast Corridor Improvement project?
Who is Blitz?
This street had night construction by a franchise utility from 10pm to 4am with limited public notice.
What is Goat Hill?
This project will remove 12 established trees that have buckled the adjacent sidewalk or impede pedestrian visibility?
What is Downtown Kirkland Crosswalks?
Since CKC commuters live in various areas around the City, notifying them of CKC closures requires what kind of media
What are signs?
This car dealership fought the City's attempts to prevent left-turn into its car lot.
What is Honda of Kirkland?
This City of Kirkland staff member asked CIP to organize the biggest ribbon-cutting event in Kirkland's history for the Totem Lake Connector.
Who is Kurt Triplett?
This project (which had a noise variance) had jackhammering well past midnight and prompted multiple social media posts and emails about construction noise.
What is Central Way Overlay?
Public Works staff hosted a public meeting at this downtown location to prepare the public for the removal of a dozen street trees along Kirkland Avenue
What is Merrill Gardens?
Many of the concerns about the CKC's closure at Northeast 85th Street were for the safety of this group of community members.
What are middle school children?
What is 116th Avenue NE widening project?
To commemorate the completion of the Park Lane project, the City partnered with this downtown business group.
What is the KDA (Kirkland Downtown Association)?
While night construction in residential areas tends to generate emails and phone calls to the City Council (and all of us), night construction in these areas tend to generate fewer outreach concerns.
What is business districts?
The business operators on Park Lane supported tree removal along their street because the existing trees forced them to do what?
What is tree maintenance?
Unlike City streets, the CKC closes between what two periods of the day.
What are dusk to dawn?
Project managers should consult with this community member before implementing any form of access control that would alter access to a property.
What is the business operator (and property owner)?
Ribbon-cuttings are scheduled to take place no earlier than six weeks after passing this phase of construction.
What is Substantial completion?
Night construction on this project resulted in a resident delivering powerpoint presentation about the impacts at a State of the City address.
What is the NE 85th Street Corridor Improvements?
This group defended the decision to remove trees at 132nd square park after staff notified them of the background and replacement strategy
What is City Council
When expecting a long-term CKC closure, you should ensure this meets accessibility needs.
Pushback from businesses along this corridor reduced the number of access control points from X to X?
What is 100th Avenue Northeast Corridor Improvements?
To ensure the Sixth Street Corridor Improvements project was substantially complete by the ribbon-cutting date, this agency helped the City complete striping and thermoplastic?
What is King County?