PROJECT MANAGEMENT
MP
OTHER SYSTEMS QUESTIONS
SENSITIVITY ANALYSIS
WILDCARD QUESTIONS
100

Project Management is often described as an optimization of these three project properties

What is time, cost, and quality

100

This is the graphical representation of the values of two objective functions at the extreme points of a feasible region.

What is objective space?

100

The inequality of a constraint can be removed by introducing this.

What is a slack variable?

100

This is the answer to the question: "What is the quality of the Linear Program result."

What is sensitivity analysis?

100

This Russian Empress is famous for dying while f**king a horse.

Who is Cathrine the Great

200

The longest duration path in a project schedule that also determines the shortest possible project time.

What is the critical path?

200

This example was used in almost every linear programming lecture, despite getting old after only the second one.

What is the concrete example?

200

This is a three word description of all feasible regions.

What is convex, compact, and continuous

200

These are the types of solutions possible for a Linear Programming problem

What are Unique, Infeasible, Alternate Optima, and Unbounded?

200

This is the first name of Batman's love interest in the 2008 classic The Dark Knight.

Who is Rachel?

300

Resource Leveling does this to project time and keeps resources be that?

What is increases and unlimited

300

Developed by a fascist madman, this property is used in many different fields for determining a set of non-inferior solutions.

What is the Pareto Optimal?

300

The property of a optimization model where a solution implies probabilistic variability of the output?

What is stochastic?

300
This type of sensitivity analysis adjusts the constraints of the problem to determine the ranges over which they control the feasible region.

What is Right Hand Side?

300

This great conqueror died unceremoniously of a nosebleed on his wedding night.

Who is Attila the Hun?

400

This is an activity relationship where a second activity must start a number of days after a first finishes.

What is a finish-to-start with delay relationship?

400

This method of solving LP problems involves finding an initial solution, then moving to improved adjacent feasible solutions until no further improvement can be made.

What is the simplex algorithm?

400

This is the equation for a Single Moment check when leveling resources.

What is ∑(resource demand)2

400

By adjusting a single coefficient on a function to be maximized, in order to determine the stability of its optimal point, you are performing this.

What is Objective Function Sensitivity Analysis?

400

This change to the American constitution is the favorite of college students and closet drinkers all across the country.

What is the 21st Amendment?

500

This is the equation for Total Float Time (TF)

LS-ES OR LF-EF

500

Multi-objective Programming falls into this category of optimization problem.

What is Deterministic and Prescriptive?

500

This is the maximum of Z=400x1 + 200x2, subject to 

18x1 +3x2 <=800, 

9x1 + 4x2 <= 600, 

x2<= 150, and

x1,x2 >= 0

 What is 30000?

500

This is the amount an individual should be willing to pay to change a constraint.

What is the shadow price?
500

This is a dummy variable that results in a decrease in public transportation ridership used as an example in my latest CIVE 341 Assignment

What is a pandemic?